      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)

        Status from last time - batch 7 (normal resistivity), batch 8 (too high)

        Batch 8 - 1x240 degrees baking provokes another drop on resistivity, 2x baking at 240 does not change the resistivity. 

        Batch 7 - 1x 240 degrees baking, resistivity dropped, uniformity increased because the drop in resistivity affects regions with higher resistivity

        We selected 4 foils (already baked at 220, still too high), and this week they will be baked at 240, we hope to see another drop in resistivity to be closer to 400. if it's still larger than 400 we can still use them, but we wanted to understand the process before we start the production.

         

        We don't expect any new detectors before the end of the year. 

         

        This week or next week we expect new hirose connectors.

         

        ERAMs from Saclay to CERN brought to Rui for cleaning: ERAM13 and MM1-DLC2 problems with tripping. We think these detectors were dusty and the dust was kept in the chamber. By cleaning the chamber and detectors this improved. 

        Last week all detectors from mock-up were dismounted. We observed the active area under the laminar flux for the 8 detectors and we noticed that all of them had dust on the edge of the detector. For 4 of them we saw dust on the surface of the detector, but we could not remove it with anti-static roll. We gave these detectors to Rui for cleaning and will be stored cleanly. Some of them had shorts during mock-up tests. For the other 4 we asked for a simpler cleaning, and are not a deep-cleaning priority.

         

        To be updated on travellers.

      • 11:05
        Mesh pulsing 10m
        Speakers: Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
      • 11:15
        ERAM gluing 5m
        Speakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))
      • 11:20
        ERAM testing 10m
        Speakers: Charlotte Riccio (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        ERAM 23 was scanned last week by Shivam and David. everything went well. Scan looks fine. 

         

        Laura and Katharina are on site, but would need another person to lift the detector. 

        Stefano can help on Wednesday morning. 

         

        Clean room cleaning - door between small and big clean rooms was left open - bad!

        Found a wood splinter probably from laminar flux structure. 

        We think that most of the dust that affects the detector is coming from us. We have to be careful to be properly equipped. We are thinking of putting another coat when we will mount the actual TPCs on the detector. 

         

        We were not able to switch on the oven in the clean room. What is happening? We should investigate. If not able to fix oven then we can proceed without the baking. We should ask Charlotte. 

         

        Humidity seemed to go down quickly last week after Ar flushing. 

         

        Need to start planning shifts for next year - start planning on 3rd week of January

         

        Prototype - gas leak test on the prototype and HV test (ask Thorsten?)

      • 11:30
        ERAM AOB 15m