ERAM Meeting

→ Europe/Zurich
Alain Delbart (Université Paris-Saclay (FR)), Laura-Iuliana Munteanu (CERN)
    • 11:00 → 11:45
      ERAM status
      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN)

        We selected 4 foils from batch 7 DLC to start DLC pressing and production. 

        Production started!

         

        We are discussing how to cope with the cleaning o the 6 detectors we gave Rui because they need to see how to organize the work without affecting detector production. 

        One idea: clean the two detectors which trip first, then bring back the other 4 ERAMs to 182 and we can try to do the cleaning ourselves. 

        Priority is to press the DLC before Christmas (cleaning is secondary priority)

      • 11:05
        Mesh pulsing 10m
        Speakers: Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
      • 11:15
        ERAM gluing 5m
        Speakers: Charlotte Riccio (CEA-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))
      • 11:20
        ERAM testing 10m
        Speakers: Charlotte Riccio (CEA-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR)), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        ERAM 01 scan : two noisy channels appear. 

         

        While doing the pedestals, David saw two pads with higher rms than in previous scans, but due to time constraints the shift started anyway. The two noisy pads appear randomly throughout the scan. We saw the same things when we didn't cool down the electronics earlier in the year. The rest of the data is still usable.

         

        We never saw these pads on ERAM01, so they might be due to a bad connection. Stefano and Katharina are sure that the cooling was on. It is worth checking the water level in the cooler. We need to be careful not to fill it too much. 

         

        The LV of the electronics cards has an issue - the remote control is no longer working. This is to be fixed this week.

         

        This week - no new detectors available, so shifts are cancelled until the end of the year. 

        Our to-do list: check the data base and check that the setup is working correctly before testing any new detectors. 

         

        Katharina - turn the gas flow off for this week and I would like to look at the humidity curve next week when I'm back. We decide to keep the detector in the chamber for now, no need to remove. If needed we can try to mount and dismount the electronics. Want to see also if connection to LV is due to USB. 

         

        Stefano: USB is problematic, because it has two endpoints and one of the two microcontrollers can hang due to a reboot. The only thing that can work is powering on and off both sides. For the HV power supply, power cycling works, not sure if this works only for the LV. Concerning the detector - how do we want to leave it during the break?

        Alain: we close the gas bottles. The detector stays on the bench. 

         

        Leak tests: this week, after shift is finished, cut off the gas, and launch serial save to see how fast the humidity is decreasing. Then next week do tests on gas flow level. To do with Argon. T2K gas seems to introduce more humidity. Is this because the gas pipes are long and outside? Perhaps the leak is not on the chamber but rather the system. We can do the test Katharina suggested with both Ar and T2K gas. If the line is identical, there should be no difference between Ar and T2K gas. If there is a difference, it is because of the length/nature of the pipes most probably. Guillaume will come to CERN next week. 

         

        Stefano: Cyrille mentioned when we were installing the black pipes that we should cut off a small piece of the tube from time to time. But not sure how much to cut. 

        Alain: These tests can give us some reference data. We can then redo these tests at the beginning of the next year after some alteration to the pipes and redo the tests. Worth doing before restarting scan at the end of January. 

         

        Next week no meeting. Instead, today gas will be turned off after shift, serial save launched, and next time we touch the test bench is on Tuesday evening (Katharina turn on gas). 

        For the cosmics with the prototype: doesn't anyone know if and when Thorsten will do/did the gas leakage tests? Alain: discussed with Gianmaria at Saclay last week and my understanding is that this will be done this week. Will clarify at 4pm. Cosmics trigger is set up and working. Would be good to cross-check if this works (perhaps next week?). 

         

        Skip meeting on the 19th - send an email to confirm what was done. 

         

        Next meeting Jan 9th. 

         

        Issue with oven seems related to power supply at the back of the oven. There is a metallic box behind the oven where the power chord is connected. When you plug in and out there is a switch and it seems that there is a problem at that level. Katharina contacted Charlotte and she contacted Thorsten. Then Charlotte contacted Francesco Pietropaolo and signaled the issue (will check if under warranty and ask for repair perhaps). It would be nice to have this fix before restarting the scans. 

         

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Cyrille Vuillemin (Université Paris-Saclay (FR))