Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !

12–16 Dec 2022
IISER Mohali
Asia/Kolkata timezone

Firmware Development for the Phase-2 Upgrade of the Calorimeter L1 Trigger for the CMS Detector

14 Dec 2022, 17:00
15m
LH1 (IISER Mohali)

LH1

IISER Mohali

Lecture Hall Complex, IISER Mohali, Sector 81, Knowledge city, SAS Nagar, Punjab, India

Speaker

Piyush Kumar (University of Hyderabad, India)

Description

The CMS Level-1 trigger, including the calorimeter trigger, will receive a massive upgrade to avail of the benefits and tackle the challenges posed by the High-Luminosity LHC (HL-LHC). Calorimeter trigger is planned to employ high-speed optical links (~28 Gbps) and Xilinx Large UltraScale+ FPGA to meet the high bandwidth and parallel computing demands of the HL-LHC. The system will handle 25 times more granularity and intends to process the newly commissioned high-granularity calorimeter (HGCAL) information. To process such high granular information from large calorimeter geometry, trigger algorithms are proposed, which provide better performance in terms of latency, area, and scalability.

Session Future Experiments and Detector Development

Primary authors

Bhawna Gomber (University of Hyderabad, India) Piyush Kumar (University of Hyderabad, India)

Presentation materials