WG5 CLIC Physics and Detectors

→ Europe/Zurich
4/1-021 (CERN)

4/1-021

CERN

8
Show room on map
Description
excused: A. Herve
DRAFT summary notes
webex info
    • 16:30 → 16:35
      Discussion, around the table 5m
      • Further integration and layout studies 15m
        - which are the studies missing for the CDR ? - which type of drawings are requested for the CDR ? - more details on alignment, on muon systems, on infrastructure ? - more details on platforms ? pre-isolator ...
      • News from S.C. cable extrusion 5m
      • QD0 fringe field - message from M. Modena 1m
        mail
    • 16:50 → 17:10
      CDR matters 20m
      CDR Vol. PhysDet deadlines
      • CDR chapter 9 on superconducting solenoids and magnet systems - plans for the next 4 weeks 10m
        chapter 9 (recent version)
        draft LCD note on SC coil, by B. Cure
      • CDR chapter 13 on Interaction region and detector integration - plans for the next 4 weeks 10m
        chapter 13 (Aug. 2010)
        chapter 13 with suggestions from HWeerts and LLinssen
    • 17:10 → 17:20
      A.O.B. and next meeting 10m
      • change of date (15 March is not possible - new date 11 March 10:30 GVA time) 1m