    • 08:00 08:20
      Roberta Faggian Marque 20m
      DILIGENT *WP3.1* - follow up on gLite requirements - subscription to EGEE VO managers group *WP8.1* - preparation of Release Beta planning meeting - meeting with ETICS about DILIGENT requirements and plans - planning deployment testing for Release Beta - planning Release Beta integration activity and testing *WP4.2* - abstract for Grid 2007 - proposals for ISSGC07 - article for ISGTW in collaboration with ETICS - review abstract for EGEE UF poster and demo session - review of demonstrators *WP4.3* - Biomed community confcall about support to WISDOM data integration in DILIGENT *Other* - contributions to Jan31 deadline - meeting in Pisa/Tirrenia about FP7 - DILIGENT software name - ExCom phone meeting - summer student project proposal - discussion on future developments of DILIGENT - confcall on FP7 and collaboration with FAO EGEE *RPLO* - review of EGEE RP public pages - registration of two new projects (EGRID, EU-IndiaGrid) - plans for RPs information point at EGEE User Forum NA2 stand - update of RPs technical web pages - reviewed/tested RP database implementation - RP analysis final report (ppt) - updates to RPs web pages - contacting RPs for EGEE user forum EGE/RP - monthly meeting - reporting - IT meeting about CERN's participation in EU projects - meeting with Tim and JY about DILIGENT/DRIVER/BELIEF - fellows appraisal interviews
    • 08:20 08:40
      Florida Estrella 20m
      EUChinaGrid Lanxin Ma contract extension Review Preparation WP3 tconf minutes http://indico.cern.ch/conferenceDisplay.py?confId=12242 Reviewed postervX, some comments sent to R Barbera, po EUMedGrid Domenico Vicinanza contract extension Review preparation Review demo Reviewed posterv6, some comments tb-sent to Ricardo BalticGrid FP7 discussions BG ICC 5 preparation Review new brochure SEEGRID2 D22 contribution FP7 planning SG1 final payment 3QR preparation PSC04 preparation HeC Review tech ppt & demo prep Review tconf (07.02) Review reports prep, financial prep ICEAGE docs for Dita EGEE-II UF related activities, booths, etc Interactions diagram updated with EGEEII QR3
    • 08:40 09:00
      Pedro Andrade 20m
      WP1.2 (1.5) - DILIGENT infrastructures status WP1.7 (0) WP1.8 (5.5) - M1.8.2 review and conference call - release Beta meeting: organization, slides preparation, collection of release Beta components - usage of the Package Repository and DL Management services for the deployment testing activity - meeting with ETICS responsibles WP3.1 (9.5) - risk analysis document contribution, revision and conference call - discussion and subscription to the VO managers group - analysis of gLite critical requirements - experimentation with GFAL and WMProxy in Java WS-Core environment - experimentation with WMProxy and LB WS interfaces - talk with Erwin about gLite critical requirements WP4.2 (1) - preparation of a tutorial propsoal for Grid 2007 conference - organization and interview for the DILIGENT/ETICS article in iSGTW WP4.3 (0) Other (2.5) - preparation of ETICS review slides - participation in ETICS review (and dress rehearsal) - fellow apraisal report: meeting and report preparation Holidays (0) Last Update 28/02
    • 09:00 09:20
      Konstantin Skaburskas 20m
      Konstantin Skaburskas February, 2007 Major work for Health-e-Child; major changes in workplan ---------------------------------------------------------------- -- Meetings with project partners with relation to HeC EU Review. -- Help to Siemens in deploying of their site (emailing/phone calls). -- Finalization of HW specifications for servers to be bought for hospitals. -- AMGA - inst/conf for testings and integration into HeC Portal. -- Preparations for Quattor-based test deployments. Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- -- PPS updates Major issues arising -------------------- - Major events attended (include links to event/presentation) --------------------- - Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- - Holidays during the period ------------------------------------------------------------ * days 0 * TimeSheet for the month ------------------------------------------------------------ WP5/T5.1 00% WP5/T5.2 00% WP5/T5.3 00% WP5/T5.4 100% WP5/T5.5 00%
    • 09:20 09:40
      Lanxin Ma 20m
      Lanxin Ma Feb. 2007 Major work for ; major changes in workplan ---------------------------------------------------------------- 1. Contract extension 2. Solve EUChian SAM server publish problem 3. Upgrade EUChina SAM clients 4. Submit tickets, investifate & solve the following problem Beijing-cnic, beijing-lcg2 CA update Beijing-lcg2 SE problem Poland site CE problem EUChina new site HG-03-AUTH SE,CE & SRM problem INFN-rome3 CE problem 5. 2nd voms maintenance 6. EUChina Wp3 tconf(6th,Feb.) and write minutes http://indico.cern.ch/conferenceDisplay.py?confId=12242 7. Following EUChina review information Major work for ; major changes in workplan ---------------------------------------------------------------- 1. VOMRS/VOMS maintenance & troubleshooting 2. Process all of user's requests, problems, tickets about VOMRS 3. Write "How to update Grid & VO AUPs in vomrs-1.3" guide http://goc.grid.sinica.edu.tw/gocwiki/How_to_update_Grid_and_VO_AUPs_in_VOMRS-1.3 4. Setup voms/vomrs with oracle oci drive on test host 5. Update voms to the latest ersion on my test host 6. Attand voms GAs meeting about voms new feature GAs, setup test enviroment and vomrs bug priority 5. Read WN,CE,Torque and Yaim documentation 6. Install 2 WNs 7. Insatll 1 CE 8. Setup my own test grid site (include 1CE, 1SE) and run a job sucessfully 9. Attend a meeting & disscuss about how to use vGrid in CERN_PPS Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 1 days( 21st Feb.) TimeSheet for the month ------------------------------------------------------------ WP3/A3.3 100% Infrastructure status ------------------------------------------------------------ 9 of sites in project 9 of sites contributing to the EGEE production infrastructure 953 of total cpus total SE: 10 total RB: 7 total FTS: 0 total LFC: 1 total Local LFC: 0 total GridICE: 9 ************************************************************
    • 09:40 10:00
      Rolandas Naujikas 20m
      Rolandas Naujikas 02, 2007 Major work for BalticGrid; major changes in workplan ---------------------------------------------------------------- SAM maintenance. Cluster VU-MIF-LCG2 updates. Hardware upgrade for WMS in Lithuania. Investigating Quattor. Major work for ; major changes in workplan ---------------------------------------------------------------- PPS upgrades. Major issues arising -------------------- Major problems with RB in Lithuania (solved). Major events attended (include links to event/presentation) --------------------- Trip to VU-MIF-LCG2 to help install and configure new cluster. The result is 40 CPUs and 3TB SE available. Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- none Holidays during the period ------------------------------------------------------------ 1 TimeSheet for the month ------------------------------------------------------------ NA2: 0% NA3: 0% SA1: Task2: Core central grid services: 60% Task5: User support system: 10% Task7: Logging and accounting system: 10% Task8: Validation and certification of production sites: 20% Infrastructure status ------------------------------------------------------------ 26 sites in project 14 sites contributing to the EGEE production infrastructure 856 cpus (average) 60TB of SE
    • 10:00 10:20
      Dusan Vudragovic 20m
      Dusan Vudragovic February, 2007 Major work for SEE-GRID; major changes in workplan ---------------------------------------------------------------- * Wiki page about SEE-GRID helpdesk tickets http://wiki.egee-see.org/index.php/SG_Helpdesk_tickets * Grid-Operator-On-Duty for one week Major work for GD-OPS; major changes in workplan ---------------------------------------------------------------- * SAM support * ROC on duty for two weeks * Updates of SiteProblemsFollowUpFaq GOC wiki pages Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- * SEE-GRID-2 PSC04 meeting in Kopaonik, Serbia Holidays during the period ------------------------------------------------------------ 0 days TimeSheet for the month ------------------------------------------------------------ WP3 A3.1 100% Infrastructure status ------------------------------------------------------------ 29 of sites in project 10 of sites contributing to the EGEE production infrastructure 680 of cpus 16.33 TB total SE
    • 10:20 10:40
      Domenico Vicinanza 20m
      Domenico Vicinanza February, 2007 Major work for EUMEDGRID; major changes in workplan ---------------------------------------------------------------- - SAM Server maintainance for the EUMEDGRID installation in Malta. - SAM Client installation and configuration for EUMEDGRID in Cyprus. - Moving SAM Client from Greece to Cyprus. - Majow work as responsible for the EUMEDGRID Demo at the First Year Review in Madrid (Feb. 27th-28th, 2007): -- Preparing EUMEDGRID infrastructure: deployment of the chosen applications for the DEMO: CODESA-3D (an application simulating the flux of underground waters with complex numerical models and monte carlo) and Archaeogrid (actually MM5V3 and NCARG packages, a weather forecasting program with visualizer) -- Follow up of the installation of the additional packages required by CODESA-3D and MM5V3 on the EUMEDGRID sites -- Follow up the installation and configuration of a GENIUS (a web portal developed by INFN-NICE srl) portal in Cyprus which will be used during the Demo customizing it to support the two selected applications Major work for <GD-OPS; GD-ITR>; major changes in workplan ---------------------------------------------------------------- - SAM Test integration Worked supporting ALICE VO to integrate new VOBOX tests for the ALICE Experiment. ALICE, through the interface of Patricia Mendez Lorenzo, asked me (as member of the SAM Team) to integrate 7 VOBOX tests they were regularly running as standalone scripts on an ALICE UI. (https://lxb6114.cern.ch/sam/sam.py?sensors=VOBOX&regions=Default&vo=alice&order=SiteName&funct=ShowSensorTests). I used a new integration technique, which was successfully used for the first time in a real situation. The tests were launched as script on an ALICE UI, where a SAM client (standard installation) has been installed and configured and it has been used the SAM publishing environment only. Major events attended (include links to event/presentation) --------------------- First EELA, EUChinaGrid and EUMedGrid Projects' Review (as Demo Chair for the EUMEDGRID project) February 27th-28th, 2007 at CIEMAT, Madrid Agenda at: http://indico.eu-eela.org/conferenceTimeTable.py?confId=74 Slides available at: http://indico.eu-eela.org/materialDisplay.py?contribId=27&sessionId=48&materialId=slides&confId=74 EUMEDGRID PMB during the First EELA, EUChinaGrid and EUMedGrid Projects' Review February 25th, 2007 at CIEMAT, Madrid Minutes available at: http://indico.cern.ch/conferenceDisplay.py?confId=13380 Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 2 day TimeSheet for the month ------------------------------------------------------------ WP3/A3.2 and 4.3 60% WP4/A4.2 and 4.3 40% Infrastructure status ------------------------------------------------------------ # of sites in project: 12 (10 Countries, 8 Mediterranean Countries) # of sites contributing to the EGEE production infrastructure: # of CPUs: 682 total SE: 18 total RB: 7 total FTS: 0 total LFC: 2 total Local LFC: 0 ************************************************************
    • 10:40 11:00
      Alexandre Duarte 20m
      Alexandre Duarte February, 2007 Major work for EELA; major changes in workplan ---------------------------------------------------------------- * SAM Maintenance * EELA Grid Operation * Configured SAM to submit tests for the two eela VOs. * Updated the EELA SAM Dashboard to support the two eela VOs (https://sam.eu-eela.org/) * Support the installation of an EELA site at UFCG/Brazil Major work for GD-OPS major changes in workplan ---------------------------------------------------------------- * Helped to deploy the my Google Maps interface for SAM on PPS http://egee-pre-production-service.web.cern.ch/egee-pre-production-service/maps/index.html * Wrote and submmit a paper about the Service Availability Monitoring framework to the Grid Monitoring Workshop, in conjunction with the HPDC 2007. Event page: http://hpdc-monitoring-ws.web.cern.ch/hpdc-monitoring-ws/ * ROC on Duty - 05/02 to 09/02 * Helped Dusan with the ROC on Duty stuff. Major issues arising -------------------- Major events attended (include links to event/presentation) --------------------- 1st EELA/EEMED/EUChina Review (21 to 28/02/2007) Agenda: http://indico.eu-eela.org/conferenceDisplay.py?confId=74 Plans to attend/organize major events (intra-EGEE and others) ------------------------------------------------------------- Holidays during the period ------------------------------------------------------------ 1 day TimeSheet for the month ------------------------------------------------------------ WP2/T2.1 45% WP2/T2.3.1 30% WP2/T2.3.2 25% Wp4/T4.2: 0% Infrastructure status ------------------------------------------------------------ # of sites in project - 13 # of sites contributing to the EGEE production infrastructure - # of cpus - 572 total SE 60.8 TB ************************************************************
    • 11:00 11:20
      Marc Ozonne 20m
      ** ICEAGE ** WP3 -- GRAM4/Condor CE prototype-- Fixed problems of job submission through Condor-C. --Grid in a Box for training-- Studied VMWare virtual services provided by Gilda Testbed. Prepare XEN installation (installation of SLC4 --kernel 2.6 + LVM logical partitions) Meeting with SA3 --> share their experience about using XEN for a testing insfrastructure.