Conveners
WP6
- E. JENSEN
WP6
- E. JENSEN
Description
Wednesday 23 February 2011
16:00 - 16:15 SLS Vertical Emittance Tuning: Objectives, organization and timeline 15'Speaker: Erk Jensen (CERN)
16:15 - 16:30 CLIC damping rings emittance targets and expectations 15'
- Vertical emittance requirements
- Intra-beam scattering effect, theory, simulations and benchmarking
- Alignment sensitivity, magnet errors and tolerances
- Instrumentation needs and challenges
Speaker: Yannis Papaphilippou (CERN)
16:30 - 17:30 SLS coupling control, instrumentation and low energy running 1h00'Speakers: andreas streun (Paul Scherrer Institut PSI) , Michael Boge (Paul Scherrer Institut (PSI)) , Masamitsu Aiba
Coupling control 15'
- Summary of optics tuning of SLS storage ring (orbit, optics, LOCO, BB(G)A, etc.)
- Coupling theory
- Achievement in coupling control/suppression
- Outlook: how proceed further and related topicsSpeakers: andreas streun (Paul Scherrer Institut PSI) , Masamitsu Aiba, Michael Boge (Paul Scherrer Institut (PSI))
Instrumentation 15'
- The visual polarized light emittance monitor
- The BPM system: performance, resolution etc.
- The dynamic alignment system: components, methods, experience
- Lifetime measurementSpeakers: andreas streun (Paul Scherrer Institut PSI) , Masamitsu Aiba, Michael Boge (Paul Scherrer Institut (PSI))
Energy scaling of storage ring 15'
- What has been done, what were the problems.Speakers: andreas streun (Paul Scherrer Institut PSI) , Masamitsu Aiba, Michael Boge (Paul Scherrer Institut (PSI))
Intrabeam scattering 15'
- Analysis of (Touschek) lifetime, confirmation of optics correctionsSpeakers: andreas streun (Paul Scherrer Institut PSI) , Masamitsu Aiba, Michael Boge (Paul Scherrer Institut (PSI))
17:30 - 17:45 SUPERB design, contribution and expectations from SVET 15'Speaker: Marica Biagini (INFN-LNF)
17:45 - 18:15 Emittance optimization for SUPERB and experimental results from DIAMOND 30'Speaker: Simone Liuzzo (INFN-LNF)
18:15 - 18:30 Discussion 15'
Thursday 24 February 2011
08:30 - 10:00Discussion 1h30'
- MDs organization and schedule
- Simulation effort (Vertical emittance tuning + IBS)
- Hardware upgrades (Correctors, BB(G)A)
- Running at low energies
- Instrumentation development and tests
- Summary preparation