      Summary of Actions 20m

      This is a follow-up of the meeting held on June, 1, 2022.
      Situation:
      - summary of observations from 1st June 2022 presentation
      - notes from R. Louwerse on shutdown checks of the Pt probes available
      - diagrams from SY-RF-CS do not show to which position on the tanks the cables are connected
      - complete drawings of where the individual Pt100 probes are located have not been
      found
      - links to drawings:
      - Actions:
      i) next occasion for Access: make pictures of the tank and where the connects are (Carlos Oliveira)
      ii) in the September technical stop, identify by cutting cooling individually which Pt100 probes is linked to which location in the tank with respect to the cooling heads
      iii) in the shutdown VSC proposes to change the cooling head by a spare available, but with a different flange

      Speaker: Wolfgang Hofle (CERN)