LNO round table
LNO round table meeting Thursday 29/9/2022.
News, Rogelio : the latest LHC schedule proposal for Nov. Dec. 2022 and the for the startup 2023 are shown below.
Please send IPAC proposals with author and title to Rogelio asap for a first discussion next week.
CMS report they receive 5-10% less luminosity than ATLAS. The CMS normalization should be correct to a per cent, ATLAS has still a ~5% uncertainty.
FCC, Helmut : the 2nd FCC Polarization Workshop at CERN https://indico.cern.ch/event/1181966/ ends this week. An FCC-EIC Joint & MDI Workshop 2022 https://indico.cern.ch/event/1186798/ is scheduled on 17-24 October with several contributions from LNO members. Michael Hofer used successfully a test sequence with corrector+solenoid+ slices and works with Helmut to provide this as option in the FCC optics repository.
CMS IP shift for 2023, Stephane, slides
------------------------------------------
CMS requests to move IP5 horizontally outwards by 1.1 mm before the restart next year. Stephane presents two options how to do this.
The first and preferred option is to do this by actually moving magnets from ~Q5 to Q5, leaving the TAN and DSBX in place. This may involve moving activated equipment (tertiary collimators). It is not yet known if this can be done in the end of year shutdown (YETS).
The second option is to do this by orbit bumps using orbit correctors up to Q8 on one and Q7 on the other side, requiring to not use more than 50% of the available corrector magnet strengths to leave room for orbit correction and luminosity scans. He finds that aperture is not an issue and will next asses the impact on dynamic aperture. The two options will be further discussed at LBOC. The plan is to deliver recommendations for LMC in early December.
As a side finding Stephane has observed that this knob applied with the appropriate sign has the feature of decreasing LRBB interaction strength with the same crossing angle (lower beam-beam at same luminosity, or larger lumi at same beam-beam).
LHC optics measurements, Tobias
-------------------------------------
Tobias reports that the optics measurements before and after the recent stop gave very similar results and confirming the LHC is in good shape to continue running. He mentions one detail not seen before resulting in currently unusable signal with k-modulation that will be followed up by also looking at raw data and the used of FFT methods.
MADX and HL-LHC updates, Riccardo, slides
------------------------------------------------
As already discussed in the LNO meeting on 31 August https://indico.cern.ch/event/1195317/ , a new large MAD-X release is planned soon. One major addition is on space charge for tracking. Few more checks and fixes remain to be done before generally releasing the new MAD-X version.
Work is in progress for HL-LHC : on the choice of the new TCLMB shape and on the absence of MS (sextupole) in Q10 to be able to already squeeze down to 20 cm beta* in RUN4 to give more room for luminosity optimization in earlier HL-LHC running that may have other (for example intensity) limitations. Work is also in progress for the layout geometry test and needs for beam-pipe dimension between D1 and D2.
LEIR & various news, Felix, slides
-----------------------------------
Felix reports from work on injectors. Work is in progress for LEIR optics measurements using the improved BPM system and integrating LEIR further in the online modeling and correction software (OMC). A next step is to test the extraction kicker in cycles for optics measurements. He works on the optics measurements in the SPS driven by SPS crab cavity MDs for a study of multipolar components and on including the SPS in OMC3. Reproducibility issues were studied with K-modulation with both step and sine functions in a mini MD in the LHC and are followed up. All modulations so far show a systematic tune shift between the ascending and the descending part of the K-modulation. This could be due to timing issue or hysteresis.
LHC knob extraction, Andreas
-------------------------------
Andreas is working on the online model including knob extraction. Few more weeks will be needed to get the LHC into OMC3, to be followed by further efforts for the injectors.
This was followed by a more general discussion on possibilities and limitations in the OMC and state tracker to be able to provide a machine model for any given time. At present, the information on trims done during a fill may not be fully available after the end of a fill.
Rogelio says we should continue to ask the LSA teams to help in this efforts.
7TeV CLIC BDS with MAD-NG, Enrico, slides
------------------------------------------------
Encrico compared MAD-X/PTC and MAD-NG using the 7 TeC CLIC beam delivery system (BDS) optics. While beta functions are in good agreement,
he observes differences in dispersion and small differences in the IP beam size from 4th order. Map generation is faster in MAD-NG. Laurent comments that results can be very sensitive to input parameters and that he has a newer MAD-NG version that is not yet generally released.
Laurent adds that the is working on documentation for MAD-NG and that a MAD-X course will be organized in November.
Analysis of the Amplitude Detuning Corrections via b6 correctors, Joschua, slides
--------------------------------------------------------------------------------------
Joschua finds that the beam based b6 (dodecapole, K6) corrections agree well with the magnetic model for IP1, and also, but not quite as good for IP5. Tobias plans to try out the corrections in the machine.
Jacqueline said she participated in the FCC Polarization Workshop at CERN and the eeFACT2022 workshop in Frascati, and is working on the writeup for the proceedings.
Felix Soubelet (via zoom) said he is in the writing phase for his thesis and is interested to come back to CERN for MD1 in November.
Ewen is active in injector and LHC optics measurements. On the LHC side he said he checks the polarity of K-modulation and looks into an observed b4 deterioration between Run 2 and Run 3.
Rogelio said that we should discuss with OP and experiments to create an opportunity to measure the IP5 optics when the CMS solenoid is off.
LHC MDs: Oct 17-18, Nov 5-8 and Nov 22. End of Run 28 Nov:

LHC 2023 start on March 27. IPAC 2023 May 7:

IPAC author and title deadline to be sent to section leader via google document: Oct 7th.
CMS calibrated luminosity to 1%, while ATLAS still remains with ~5% uncertainty.