AD DI line consolidation

→ Europe/Zurich

Hello

Here are draft minutes of the AD DI line consolidation meeting, in view of validating the Power converters technical specification, part of AD-CONS.

Thanks for your feedback. 

A follow-up meeting will be organized on the 2nd of Dec to discuss the case of 6010 and 6020 magnets, and then we shall have an enlarged discussion to confirm the orientations proposed.

Many thanks, kind regards.

Francois

 

Present: L. Ponce, D. Gamba, Y. Dutheil, D. Nisbet, T. Todorcevic, A. Newborough, C. Machado, F. Butin 

Slides are available at https://indico.cern.ch/event/1221209/

 

  1. Status of the DI line power converters and current cons proposal (T. Todorcevic)

The power converters for the AD injection DI line (between the target and the AD ring) are located in building 370. This includes 8 operational units plus 4 spares, all being about 40 years old. Switching to a spare takes about 1 day, parts are still available on CERN site. In the current scheme, the power converters pulse every 2.4 s for thermal stability reasons, while the beam is injected every 100 s approximately. 

The power converters for BHZ6024 and 6025 are very high current and include in their circuit current transformers for reaching the nominal 68 kA current (6024 and 6025 are single turn coil, due to high radiation environment, limiting the use of insulation, therefore requiring extremely high current). The current transformers are passive elements, nevertheless prone to failure due to insulation aging issues. Regular check is to be planned for these too (action: Todor  to propose an inspection plan).

The consolidation proposal is based on a more or less 1 to 1 replacement of the existing units, although some maximum allowable currents seem to be lower than the ones shown in the FESA classes: this point need to be checked in detail and possibly amended. The new converters include a reduction of the pulsing scheme, to limit to 4 pulses before the pulse corresponding to the beam injection, with full sine signals allowing energy recuperation. This should allow for a reduction of energy use down to about 19% to 34% of the current consumption). This would also reduce the duty cycles of the whole circuits including the magnets themselves.

The installation of 8 new converters plus 2 spares will save space in the building.

The technical spec is ready and the estimated cost is 1.85 MCHF. Installation is planned for EYETS 24-25. The existing spare parts allows to keep existing converters alive till then. It would be desirable to launch the MS + DO process asap.

The status of cables is to be checked (action: Todor to trigger an inspection of the cables with EL experts during YETS 22-23)

 

  1. Status of the DI line optics and suggestions for optimisation (Y. Dutheil)

The current beam dynamics modelling studies do not indicate optics improvement schemes, but further developments should not be excluded for the future. Yann therefore requests that some margin is included in the maximum currents delivered, eg 10% for the dipoles and 25% for the quadrupoles. These numbers can be revised in case they are to constraining.

Yann indicates that tests could be planned to reduce the number of pulses before injection with the existing equipment, avoiding the continuous pulsing scheme currently used, as suggested by Todor, and check that the stability criteria can be matched. This would follow the same approach (5-pulse burst) of newly installed MarXdiscap power converters powering QFO6020 and BVT9044 today. If not possible to make updates for the timing on the old converters for the beginning of YETS (too soon considering the workload, but can be tried), it will in any case be carried-out during AD restart in 2023.. Action: Todor and Christophe to plan these tests.

 

  1. Status of the DI line magnets, spares and options for running in the future (A. Newborough)

Some of the DI line magnets are known to be in more of less severely bad conditions, for which consolidation actions are under way (BHZ6025, QFO6010 and 6020 with new coils ordered, 6025 to be replaced by spare and other spare to be decontaminated and repaired).

A number of alternative designs can be proposed for specific and old magnets, but with rather low priority, and a priori not affecting the corresponding power converters. May not apply for magnet 6010 and 6020 which will be subject of a specific discussion on 2nd of December.

It appears that the proposal to reduce the number of pulses would be quite beneficial also for the magnets, and may probably allow to avoid water cooling.

Antony indicates that MSC does not have a power converter allowing to test the magnets in the adequate pulsed conditions. (Action : Antony to discuss with EPC if some solution can be found)

The high current (6024 and 6025) dipoles could most likely be replaced by low current magnets. It is estimated that the design plus production would take 2 years and cost 500 kCHF. Todor indicates that the saving on the converters side would amount to approximately 450 kCHF as the corresponding ones are by far the biggest of the lot, and make the procurement much simpler. This would also allow to spare the current transformers.

It is therefore proposed to confirm this option with following actions: Antony to confirm the availability of resources and estimated cost for producing 2 magnets plus 1 spare, Todor to propose alternative converters that would suit the needs in a standard and economical way and check with EL if the cables could be re-used, Yann with STI to confirm the radiation environment is within 0.5 MGy/year).

 

As a conclusion, it is proposed to confirm within a few weeks and agree to launch the design + procurement of low current alternatives for the very specific and bad condition BHZ6024+6025, allowing considerable savings on power converters, that would almost completely compensate the expected cost for the new magnets. (Action: Francois to call for a new AD-CONS discussion when elements are available, and propose the change of plan to ACC-CONS management). All the other converters are proposed to be replaced, keeping 1 to 1 identical characteristics as existing ones, including reduction of duty cycles and full sine pulses.

 

There are minutes attached to this event. Show them.