Here are minutes for this meeting, held on 2nd Dec. Your feedback is welcome !

Thanks, Francois

 

Participants: Antony Newborough, Laurette Ponce, Davide Gamba, Christophe Machad , David Nisbet, Yann Dutheil, Todor Todorcevic, Francois Butin

The slides shown during the meeting are available at https://indico.cern.ch/event/1223365/

Magnets: A. Newborough

As a follow-up to the previous meeting, Antony showed a preliminary design for the replacement of 6024 and 6025 magnets. He confirmed the faisability, in the announced budget envelope (0.5 MCHF). He also confirmed resources should be available in MSC, provided the budget is made available.

The only remaining question concerns the dose expected for these magnets, expected to be 0.5 MGy/year, hence within the maximum integrated dose acceptable for the coils insulation over a foreseeable 20 years life span (20 MGy max). STI did not confirm yet the annual expected dose. Action: Yann to check with STI

If this is confirmed, then the project will be launched with a budget transfer from the CONS for the power converters. Action: Francois to deal with CONS management

Antony then showed the situation for the 6010 and 6020 quadrupoles, located straight after the target. These magnets are in poor shape, replacement coils are ordered and should be delivered during 2023, allowing to keep them alive till LS3.

Since the corresponding very high current power converters have reached their end of life, it is proposed to build a new version of the magnets, with multiturn coils, allowing much simpler and much cheaper power converters, and at the same time allowing better operational margins. MSC can propose a production of 2 magnets and 1 spare (if confirmed that 6010 and 6020 can be made identical) for an estimate cost of 380 kCHF. If finance can be made available, resources should not be an issue for an availability by LS3.

 

Power converters: T. Todorcevic

Todor presented the power converters proposed to be used for the new types of bending magnets 6024 and 6025 discussed in the previous meeting. Polaris-S could be used, confirming a saving in the order of 450 kCHF wrt high current converters in the current scheme. This change will also allow adapted operation margins and a much simpler distribution scheme, getting reads of current transformer. As the Polaris-S converters are widely used at CERN, they can benefit of large orders and simplified maintenance/spare procedures. It is therefore agreed, that providing STI confirms the expected doses, the AD-CONS management will propose to ACC-CONS management to endorse the change of magnet type and consequently to order the Polaris converters. Existing converters will be kept alive till LS3 using existing spare parts.

For what concerns the 6010 and 6020 quadrupoles,  the new design proposed by MSC could be powered by the Polaris family (2S or 2P depending on choices). The possibility to use Polaris 1S is to be studied jointly with MSC, that would result in even larger savings. Action: Todor will confirm what saving can be expected from the converters side when going for these new types of magnets, and produce with Antony a table stating the overall cost/savings for quads and bends changes.

Todor also proposes to relocate the  new converters for Di line into bdg 195. This would optimize the cooling distribution and allow simpler cabling. 

Tests have been carried out for changing the pulse mode in DI line magnets, from pulses every 2.4 s to a number of pulses (7 to 10) before injection, leading to a decrease of RMS current by 55%. This should allow to avoid water cooling at least in some magnets, TBC.

Action: Francois to inform STI of the proposed changes

There are minutes attached to this event. Show them.
    • 15:00 → 15:20
      Proposal for 6010 and 6020 magnets consolidation, characteristics, schedule, cost estimates 20m
      Speaker: Antony Newborough (CERN)
    • 15:20 → 15:40
      Proposal for adapted power converters for 6010 and 6020, characteristics, schedule, cost estimates 20m
      Speaker: Todor Todorcevic (CERN)
    • 15:40 → 16:00
      Discussion on current margins 20m
      Speaker: Yann Dutheil (CERN)
    • 16:00 → 16:20
      AOB 20m