- Katharina presented a summary of what she did before the christmas break (Thanks !)
- Flushing with Argon, the effect of the gas flow on Relative humidity was studied. Because the gas line is very short and of expected better "quality" than the T2K gas line from gas bank outside, this should define the best we can do : 12l/h is the minimal flow to guarantee the <0.4% RH
- These tests should be now done with T2K gas : longer gas line with more connection could affect the leaks & gas content in water, + the RH sensor may be affected by the 2% isobutane (cross-check with dew point monitoring will be useful).
- The LV PS control-command was shifted from USB to LAN
- David H. did FEC card linearity tests and noticed a higher than ususal noise rms (~30 Vs 6-7) : grounding issue ? and/or stronger external noise perturbations ?
- --> ERAM-01 is staying on the testbench for that (and remaining tuning of the testbench to investigate and fix the noise problem + finish the gas qulity tests in order to recover the test bench in its past "stable & robust" state and define the minimal gas flow rate used for the full x-ray scan.
- before scanning new ERAMs (from february 6th ?), MM1-DLC1 could be full scanned if back from cleaning (low probability) or ERAM-16 & 14 could be checked on the test bench (gain measurement on few pads at 2-3 differnet DLC voltages)
- Note : CERN MPGD asked us to be careful at the begining of the operation of ERAM-16