ERAM Meeting

→ Europe/Zurich
Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
    • 11:00 → 11:45
      ERAM status
      Conveners: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        • Alain got feedback from Antonio Texeira who is producing the ERAMs
          • the 4 new ERAMs built with DLC foils (3D, 4D, 6D and 7D) baked at 240°C will be "bulked" (mesh integration) this week
          • next steps (serial production) is HV testing QC before giving an ERAM to cabling, then cleaning/drying/HV testing before to cut at final size and final testing.
          • testing time can be very dependent of the ERAM, the schedule is difficult to estimate reliably
          • we will be warned when an ERAM is given to the cabling
        • ERAM-14 and 16 are back to clean room (thanks David H.) after a "painful" cleaning/testing process to recover them. Database updated. NEW (!) : ERAM-16 has a defect on the mesh (to be located in clean room/picture)
        • ERAM-2, 10, 13 & MM1-DLC2 will be soon cleaned/tested (simple cleaning since these are just "dusty" and not in short-circuit
        • could expect a first ERAM around february 6 (TbC)
      • 11:05
        Mesh pulsing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
      • 11:15
        ERAM gluing 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
        • A proposal for the organization for ERAM gluing since Cyrille left CERN (he did all the gluing) is the following :
          • Marc is in charge with support of Alain, Guillaume, David and possibly Didier in case we are stuck from coming to CERN
          • The goal is to be able to glue several ERAMs in a few days but this will be highly dependent on the actual delivery schedule from CERN MPGD lab.
          • Laura prepared a google spreadsheet for planning the on-site presence for remopte shifts (dismounting/mounting ERAM on test bench chamber usually tuesday or wednesdays). We will add a line dedicated to the planning of the gluings with the availability of Marc and others
          • speradsheet :  https://docs.google.com/spreadsheets/d/1v_RbSwg150NYVJct8RvWSl-iq4kurLhr4Nw8Cg2dmMs/edit#gid=0
      • 11:20
        ERAM testing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        • Katharina presented a summary of what she did before the christmas break (Thanks !)
        • Flushing with Argon, the effect of the gas flow on Relative humidity was studied. Because the gas line is very short and of expected better "quality" than the T2K gas line from gas bank outside, this should define the best we can do : 12l/h is the minimal flow to guarantee the <0.4% RH
        • These tests should be now done with T2K gas : longer gas line with more connection could affect the leaks & gas content in water, + the RH sensor may be affected by the 2% isobutane (cross-check with dew point monitoring will be useful).
        • The LV PS control-command was shifted from USB to LAN
        • David H. did FEC card linearity tests and noticed a higher than ususal noise rms (~30 Vs 6-7) : grounding issue ? and/or stronger external noise perturbations ?
        • --> ERAM-01 is staying on the testbench for that (and remaining tuning of the testbench to investigate and fix the noise problem + finish the gas qulity tests in order to recover the test bench in its past "stable & robust" state and define the minimal gas flow rate used for the full x-ray scan.
        • before scanning new ERAMs (from february 6th ?), MM1-DLC1 could be full scanned if back from cleaning (low probability) or ERAM-16 & 14 could be checked on the test bench (gain measurement on few pads at 2-3 differnet DLC voltages)
        • Note : CERN MPGD asked us to be careful at the begining of the operation of ERAM-16 
      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
        • Charlotte obtained quotes for the cleaning of the clean room
        • Status of the gas banks and re-order 

         

        • spreadsheet prepared by Laura to plan on-site presence during ERAM test bench shifts (we are all invited to fill it and update it when needed)
        • gas consumption : Stefano L. will have a look at the 4 T2K gas banks to measure their pressure
        • These pressure datas will be updated in the testbench shifter spreadsheet every week when a new ERAM will be scanned
        • David was at CERN this WE : he noticed that big long heavy bars (that can only be moved by crane) are preventing us from access to the blue cabinets where all our stuff is stored (FEC cards, FEM cards, screws, tools, etc ...) --> Alain sent an email to Filippo Resnatti (NP coordinator)