      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        ERAM-34 delivered feb. 17
         
        The 3 others are 25, 27, 33. They were given for cabling last friday 24th.
         
        Should get one delivered this week.
         
        Antonio baked "left foil 3 of batch 8 at 250°C : no more drop of resistivity
         
        He will bake all the foils at 240 °C and we will select 4 new foils for the next ERAMs (35-38)
      • 11:05
        Mesh pulsing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        ERAM-34 Mesh pulsing ok but 2 unconnected pads detected with pedestals : no solderinf defect, nor other defect detected by inspection at the Cabling division.
        may be an internal « weak » via in the pub which broke under thermal stress during soldering ?
         
        Next one should be MM1-DLC2 but this prototype has no mesh pulsing connector nor on-board HV filter.
        This prototype will be directly X-ray scanned
      • 11:15
        ERAM gluing 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
        ERAM-34 gluing
         
        - Training for gluing.
        Marc glued the ERAM-34. Long preparation time due to difficulties to find a way to deal with one of the centering holes in the PCB which was not enough deep.
        Didier made a very useful guiding tool to help position the stiffener on the ERAM.
        --> gluing ok
        --> a drop of glue (Loctite) was used to strengthen the mesh pulsing connector soldering (as usually done by Cyrille, but we have to check with him which glue he was using)
         
        --> may be relatred to the loctite glue : we measured a direct 38 Ohm connection of the mesh with ground, ERAM-34 mounted on test bench chambre.
        This is not normal (checked 0.7 Ohm on other ERAMs).
        To be further investigated once ERAM-34 removed from chamber
         
        - we were surprised to see the stiffeners with much more large dark areas (aluminum oxyde).
        This is due to the fact that these stiffeners were not dried before storage.
        the electrical contact there was measured poor. This oxydation should be stabilized now (?)
        We have to decide wether or not a new sandblasting and cleaning (+ drying !) is needed.
         
        test a new sandblasting on one very bad stiffener--> Stefano knows another sanfbalsting machine : he will investigate its availabilty
      • 11:20
        ERAM testing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        mounting in x-ray chamber

        lack of kapton tape in clean room

        some ERAMs are not properly taped (ERAMs given to rui came back like that) --> ERAM 02,10,13, 14, 16 et MCM-DLC 2

        David started the x-ray scan this WE. Pedestals ok. 15l/h flow, RH low (and 0 now)

        Alain & David forgot to launch the GMC. It will be lauched for the last hours of the scan.

        The scan is going-on well, except two observations :

        •  there seems to be a Top-bottom gain non uniformity (lower gain in the bottom of the ERAM)
        •  the snapshot of the x-ray spot after some points (especially in the top right area where the gain seems the highest) is not the usual cross-shape.

        to be further investigated with the datas

         

        Plan for this week : mounting MM1-DLC2 tomorrow tuesday 28th (Laura+Charlotte) if gain scan is finished as planned (with gain scan)

        Check the rack pressure (Stefano can help with a more precise measure) before launching the scan

         

         

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
        • orders to be signed (Intermediate cleaning, kapton tape)
        • to be decided for order of wheels for 2nd bottom cosmic trigger support
        • Request from WA105 cryostat team : they need to remove big parts with the crane and our tent is too high !
        • --> need to remove stuff which are inside : ok for prototype, mockup should be "free" next week.