ERAM statusConveners: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
-
11:00
ERAM production status at Rui's lab 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
Antonio was on holiday last week. We should get 2 detectors this week (25 and 27, back from cabling), ERAM 33 seems to have a defect of the mesh positioning (unknown position). They are trying to fix this.
So 25 and 27 need to be glued next week (expect to get them at the end of this week).
Alain will try to get news on the DLC delivery this week.
- 11:05
-
11:15
ERAM gluing 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
-
11:20
ERAM testing 10mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), Dr David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
MM1-DLC2 scan performed this week
- Issued with HV - the detector tripped at 350 V, so on Friday we decided to do the scan at 320 V.
- Stefano L fixed (soldered the HV filter)
- Shivam: no problem during the shift, one dead pad, appeared on pedestals.
- We had a problem with LV connection - power-cycling was enough.
- No gain gradient (but saw it on ERAM 34, so think it was an issue with it). We can faintly see the stiffener.
- We should check the gain is in accordance with that of typical gain expectation from gain curves
- Shivam: this low gain might be a problem for RC analysis. This will cause mostly 2-waveform fits, which are not very reliable.
- Shivam will do the gain scan. 325, 330, 335, 340, 345, 350 V (basically in steps of 5 until the detector trips).
- Humidity at 0 during the entire scan at 14 L/h
No new detectors this week.
Re-test ERAM 34 but upside down to test top-bottom effect? Could use this detector to test transparency.
Need to change the gas rack. We should also check the rack pressure when disconnecting.
Radioactive sources control : when not used, the source has to go back in the safe (mandatory). Please wear your dosimeter when you work on the test bench.
They want to perform a yearly check of the radioactive source. The source is not very active, so not very urgent. Charlotte will update the document with the names of the people using the test bench. There is an egroup and we should update it with the people using it. If needed to check the source, Wednesdays or Tuesdays work for the checks.
-