- wait for ERAM-35 to be delivered W21 (on-going production progresses well)
- Done : selection of 6 foils of DLC batch #3 (same as ERAM-18) and 2 half foils of batch #5 (same as ERAM-29) that have to be baked at 220°C
1) Bach 3
a. Feuille N2 droite et gauche
b. Feuille N3 gauche
c. Feuille N5 droite et gauche
d. Feuille N7 droite
2) Bach 5
a. Feuille N2 gauche (à cuire à 220 degrés)
b. Feuille N3 gauche (à cuire à 220 degrés)
c. Feuille N4 gauche (à cuire à 220 degrés)
- Therefore, we are ready to produce 8 new ERAMs as soon as ERAM-35 will be x-ray scanned week 22
- ERAM-29 cosmic runs on proto FC#2 were analyzed (Samira et. al) and confirm the 200k/75 micron glue configuration has same performances as the 400k/150 micron glue (but do we trust the 200k/75 for reliability ?)
- no news of DLC batch 9 & 10 which were shipped 2 weeks ago from Japan
- ERAM frames were given to MPGD lab to do metallographic cuts (top/bottom) to see if amplification gap is uniform