        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        • wait for ERAM-35 to be delivered W21 (on-going production progresses well)
        • Done : selection of 6 foils of DLC batch #3 (same as ERAM-18) and 2 half foils of batch #5 (same as ERAM-29) that have to be baked at 220°C
        1)      Bach 3
        a.       Feuille N2 droite et gauche 
        b.       Feuille N3 gauche 
        c.       Feuille N5 droite et gauche 
        d.       Feuille N7 droite 
        2)      Bach 5 
        a.       Feuille N2 gauche (à cuire à 220 degrés)
        b.       Feuille N3 gauche (à cuire à 220 degrés)
        c.       Feuille N4 gauche (à cuire à 220 degrés)
        • Therefore, we are ready to produce 8 new ERAMs as soon as ERAM-35 will be x-ray scanned week 22
        • ERAM-29 cosmic runs on proto FC#2 were analyzed (Samira et. al) and confirm the 200k/75 micron glue configuration has same performances as the 400k/150 micron glue (but do we trust the 200k/75 for reliability ?)
        • no news of DLC batch 9 & 10 which were shipped 2 weeks ago from Japan
        • ERAM frames were given to MPGD lab to do metallographic cuts (top/bottom) to see if amplification gap is uniform
      • 13:05
        Mesh pulsing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        • do a mesh pulsing with FEC#37 which was repaired at cabling workshop
      • 13:15
        ERAM gluing 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
        • ERAM-35 gluing expected by week 22
        • we still have to think about how to recover "shiny" stiffeners
        • ask Charlotte the availability of the flat bed on week 22 (and 21)

         

      • 13:20
        ERAM testing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
        • ERAM-33 scan : the observed area with low gain seems to be correlated to a defect of mesh stucking (see on the corresponding border). TOP/bottom gradient is inverted w/r to previous 3 ERAMs. Could be an issue of PCB. gradient could be due to the foams used when DLC is pressed : 2 kinds of foams on PCB and on DLC surface.
        • Test bench T2K rack was disconnected to be used for FC#1 tests : 6-7 bar in one thought empty rack, can be used oin the test bench.
        • still need to scan : MM1-DLC1 (as soon as the electronic failure is understood), MM1-DLC2, ERAM-27 & ERAM-34 (as soon as back from MPGD lab)

        tentative schedule (priorities) :

        • ERAM-35 is top priority (week 21 or 22 ?)
        • ERAM-34, ERAM-27, MM1-DLC1, MM1-DLC2, in that sequence (depending of delivery)