ERAM Meeting
→
Europe/Zurich
Alain Delbart
(Université Paris-Saclay (FR)),
David Henaff
(CEA),
Guillaume Eurin
(CEA/IRFU/DPhP),
Laura-Iuliana Munteanu
(CERN)
-
-
11:00
→
11:45
ERAM statusConveners: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
-
11:00
ERAM production status at Rui's lab 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
-
11:05
Mesh pulsing 10mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
-
11:15
ERAM gluing 5mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
-
11:20
ERAM testing 10mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
ERAM-37 is almost finished. Quite similar to ERAM-36 . A pad with 2 times the mean rms
ERAM remaining to be scanned.
- ERAM-35 : in clean room to give to Rui
- MM1-DLC1 : the one with the kapton to isolate FEC card backside with stiffener (short-circuit) and use of an external filter
- ERAM-25 and 27 were given by Rui, one of them has to be re scanned
Transparency curve measurements : robot on one pad (around center of chamber) increasing the cathode voltage from 100 V up to 1500 V with ERAM @ 350V (by steps of 100 V), plot of mean gain Vs drift voltage
Gain should increase, reaching a plateau (maximum electron transparency) around 960 V (around 275 V/cm) before decrease again
In order not to take risks by puting a too high voltage on cathode (which coul trigger sparks with grounded chamber body), we will limit the drift voltage range to 1500 V.
-
11:30
ERAM AOB 15mSpeakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
schedule
- this week (25) : prepare entry of bottom TPC (entrance in the tent) and cover the table arms with cling films
- next week (26) : Test the 8+ 2 spares ERAM for FC#2 in air with plastic cover at 700V (after drying in oven one night at 50°C). As soon as the bottom TPC is ready (gas tightness test planned week 25), book cleaning of clean room (around june 29-30), clean tent, enter bottom TPC in tent, clean btootm TPC, enter clean room, mount the 16 ERAMs (start june 30).
- week (27) : exit clean room, cabling of Module frames, DAQ tests.
-
11:00
-
11:00
→