ERAM Meeting

→ Europe/Zurich
Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
    • 11:00 → 11:45
      ERAM status
      Conveners: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)
      • 11:00
        ERAM production status at Rui's lab 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        ERAM productiuon is on-going (8 ERAMs, 150 micron glue, DLC foils from batch 9 baked at 220°C)

        expected delivery of first ERAM end of july

      • 11:05
        Mesh pulsing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)
      • 11:15
        ERAM gluing 5m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)

        There are 7 stiffeners left (to be checked for M3 threads, rust in helicoil threads, anf to be cleaned)

        10 ERAMs are still to produce : 3 stiffeners should be produced

      • 11:20
        ERAM testing 10m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura Munteanu (CERN), Laura-Iuliana Munteanu (CERN)

        ERAM-37 is almost finished. Quite similar to ERAM-36 . A pad with 2 times the mean rms

        ERAM remaining to be scanned.

        • ERAM-35 : in clean room to give to Rui
        • MM1-DLC1 : the one with the kapton to isolate FEC card backside with stiffener (short-circuit) and use of an external filter
        • ERAM-25 and 27 were given by Rui, one of them has to be re scanned

        Transparency curve measurements : robot on one pad (around center of chamber) increasing the cathode voltage from 100 V up to 1500 V with ERAM @ 350V (by steps of 100 V), plot of mean gain Vs drift voltage

        Gain should increase, reaching a plateau (maximum electron transparency) around 960 V (around 275 V/cm) before decrease again

        In order not to take risks by puting a too high voltage on cathode (which coul trigger sparks with grounded chamber body), we will limit the drift voltage range to 1500 V.

         

         

      • 11:30
        ERAM AOB 15m
        Speakers: Alain Delbart (Université Paris-Saclay (FR)), Charlotte Riccio (CEA-Saclay (FR)), David Henaff (CEA), Guillaume Eurin (CEA/IRFU/DPhP), Laura-Iuliana Munteanu (CERN)

        schedule

        • this week (25) : prepare entry of bottom TPC (entrance in the tent) and cover the table arms with cling films
        • next week (26) : Test the 8+ 2 spares ERAM for FC#2 in air with plastic cover at 700V (after drying in oven one night at 50°C). As soon as the bottom TPC is ready (gas tightness test planned week 25), book cleaning of clean room (around june 29-30), clean tent, enter bottom TPC in tent, clean btootm TPC, enter clean room, mount the 16 ERAMs (start june 30). 
        • week (27) : exit clean room, cabling of Module frames, DAQ tests.