10–14 Jun 2024
The Westin St. Francis San Francisco on Union Square
US/Pacific timezone

Top-up injection into the collider

Not scheduled
20m
Elizabethan B

Elizabethan B

(a) Talk abstract only FCC-ee collider design FCC accelerators

Speaker

Yann Dutheil (CERN)

Description

To maximize integrated luminosity and ensure beam stability by maintaining the charge of colliding bunches, the FCCee collider requires top-up injection. The full-energy booster will accelerate the lepton beams to the collider energy. Top-up injection presents unique challenges to continuously inject with sufficiently high efficiency while minimizing disturbances to the circulating beam and experiments. This presentation details the baseline scenario for the top-up injection with a conventional on-axis scheme. The presentation also discusses the specificities of the injection scheme across the energy modes, along with recent studies on operational operational constraints and the prospects on injection efficiency.

Primary author

Presentation materials

There are no materials yet.