Participants: K. Artoos, G. Balik, J. Barranco, B. Caron, B. Dalena, D. Dannheim, K. Elsener, J. Esberg, S. Janssens, B. Jeanneret, A. Latina, J. Pfingstner, D. Schulte, J. Snuverink, G. Sterbini, F. Stulle, A. Vivoli, Y.W. Wang
D.S. reported on the CSC meeting.
J.E. discussed the implementation of muon generation in GUINEA-PIG++. The generation of muon pairs is similar to the generation of e+e- pairs but the tracking is very different since the muons can be non-relativistic. First tracking results show that only 12.5 incoherent muon pairs should be created per bunch crossing in average. K.E. pointed out that this number is a lot lower than estimated previously. The discrepancy has to be understood.
J.S. and J.P. gave an update on the feedback performance. A tilt of the pre-isolator has been added to the simulations and the connection of girders can now have a kink. Accordingly the feedback controller needs to be re-optimized. Further investigations are required to fully recover the feedback performance. It was discussed which transfer functions should be used and how the controllers can be improved.
There are minutes attached to this event.
Show them.