Choose timezone
Your profile timezone:
Pre-distributed information - Only issues or important highlights discussed
o AMBER
o NA62
o NA64-e/mu
o NA61
o CLOUD
o GIF++ /CHARM/ IRRAD
o HiRadMat
13th Sep 17:00 - Discovery of water at the bottom of the elevator. TI called and ticket created.
20th Sep - Intervention to check elevator.
21st Sep - Second flood.
22nd Sep - Firefighters intervened, water pumped in the afternoon after RP verification (no contamination). Gutter cleaned out by SCE the same day.
As of 13th Oct - Installation of a protective fence done. Sealing of cable passages in the building planned for week 43 (Oct 23-27). Elevator repair to be planned with EN-HE