Steffen, said he is fine with the set-up
 
 
 
He likes having the CF100 detection chamber because it can be easily fit between the spectrometer and Faraday cup
 

For the operation, he said he'll be busy next week, but me and Alex can meet with him possibly on Friday to start operation

 

the gun needs to be operated manually, from the klystron gallery only the laser beamline and magnets (solenoid and spectrometer) can be controlled remotely

 
 
 
 
 
 
 
 
 
 

for the vacuum chamber, we will test the one Edu found and if it works, I'll let Steffen know, and discuss if we could install the one Edu found instead

 
 
 

Steffen asked for the chamber drawings, so that they can be integrated into the overall beamline drawing

 

Steffen said he would also be ok with having a gate valve between the spectrometer and detection chamber. He is just concerned about the space left for the Faraday cup, if we have both the detection chamber and the gate valve. He'd also like to see a 3D sketch of the integrated detection chamber

 

 
 

Will try to test the vacuum chamber Edu has found, and if it works with the MCP, I'll propose to Steffen we install that chamber instead so we don't have to order a new chamber. Alternative would be a 6-way cross. 

 
 
 