CBS set-up at CTF2
For the operation, he said he'll be busy next week, but me and Alex can meet with him possibly on Friday to start operation
the gun needs to be operated manually, from the klystron gallery only the laser beamline and magnets (solenoid and spectrometer) can be controlled remotely
for the vacuum chamber, we will test the one Edu found and if it works, I'll let Steffen know, and discuss if we could install the one Edu found instead
Steffen asked for the chamber drawings, so that they can be integrated into the overall beamline drawing
Steffen said he would also be ok with having a gate valve between the spectrometer and detection chamber. He is just concerned about the space left for the Faraday cup, if we have both the detection chamber and the gate valve. He'd also like to see a 3D sketch of the integrated detection chamber
Will try to test the vacuum chamber Edu has found, and if it works with the MCP, I'll propose to Steffen we install that chamber instead so we don't have to order a new chamber. Alternative would be a 6-way cross.