Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !

9–11 Nov 2011
Centro Nacional de Aceleradores - CNA
Europe/Zurich timezone

Diagnostics results during the ALBA SR Commissioning

Not scheduled
1m
Amphitheatre (Centro Nacional de Aceleradores - CNA)

Amphitheatre

Centro Nacional de Aceleradores - CNA

Av. Tomas Alba Edison,7 // Parque Cientifico y Tecnologico Cartuja 93, 41092, Sevilla, Spain
Poster

Speaker

Ubaldo Iriso (Unknown)

Description

The ALBA Storage Ring is a 3GeV 3rd Generation Synchrotron Light Source commissioned during Spring 2011 and whose first users are expected by mid 2012. The machine currently runs with the Diagnostics equipment already commissioned: BPMs, BLMs, fluorescent screens, FCT, DCCT, striplines, and two front ends strictly used for electron beam diagnostics (pinhole and streak camera). This paper reports our experience and first results with the diagnostics equipment.

Primary author

Ubaldo Iriso (Unknown)

Co-authors

Presentation materials