Choose timezone
Your profile timezone:
MEDICIS
Indirect irradiation of #848M carried out for production and mass separation of Ra-224 and Ra-225.
Collection could be started within 3 hours, vacuum went down to 2E-7 mbar, therefore no issue of vacuum following this irradiation (the target was new from this year, loaded with 100 g of ThC). No issue to report.
Ra-224 and Ra-225 have been extracted yesterday with 125 MBq Ra-224 (that left for Dresden, Germany) and 27 MBq of Ra-225 (that left for NPL, UK).
This week is dedicated to Tm efficiency tests in the framework of Ralitsa PhD thesis.
#868-TaC-MK1(Ta)
Target assembly done. Ready to be loaded today with TaC. Calibration planned for tomorrow.
#869-ZrO-MK1(Ta)
Target filled and calibration done today.
#810-UC-n-hot-quartz
ready for calibration
#867-UC-VD5 on GPS
gradually heating the target from while monitoring USER1 FC and 32S on FC490
#870-LaC-MK1(Ta) HRS
Planning on protons scan using radiation monitor tomorrow.
Message from GP:
Indeed we had a minor change of focusing at the beginning of 2024: