Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !

AWAKE Run 2bc Spectrometer

Europe/Zurich
6/2-008 (CERN)

6/2-008

CERN

15
Show room on map
Zoom Meeting ID
64940504093
Host
Marlene Turner
Useful links
Join via phone
Zoom URL

Spectrometer meeting minutes

 

15.05.24

 

Present:

Fern Pannell, Edda Gschwendtner, Collette Pakuza, Matthew Wing, John Farmer, David Cooke, Michele Bergamaschi

 

Discussed points:

 

-              Old spectrometer realignment

o   Access by Fern and Collette, slight adjustment made to camera position

o   Spectrometer DQM ROI changed to reflect adjustment

o   Todo: ROI could be checked by David before run two sets of eyes confirming position

 

-              Intensified camera GUI (DQM) update

o   David pulled latest version control room version up to date

o   It is designed such that It cannot lag throws away data if delay exceeds threshold

o   Todo: Background subtraction to be checked

 

-              New spectrometer upgrade

o   Camera array has now been expanded to 7 cameras

o   2 ethernet cables not working. Collette obtained two replacements.

o   Supports are in place for mounting high-res camera, supported by m BI-ML and BI-SW

o   Plans to mount high-res camera at sufficient angle such that it’s removed from beam path and does not obscure old spectrometer camera. May not be possible to avoid obstructing old spectrometer camera – assess.

o   Waiting on bandpass filters not a dealbreaker, but should arrive ahead of plunger run.

o   Todo: Fern and Collette to access (May 16th) to pull 2 ethernet cables. Additional access(es) in run2 to work on high-res camera mount and installation

 

-              Background studies

o   Test with LBDP2 in April electron signal seen in a single shot through the dump. Promising ahead of the plunger run.

o   Parasitic background measurements on old spectrometer difficult when we do not know what screens are on the line. Michele states their positions were added to the event builder from week 2 of run1.

o   John asks about background divergences from screen. David states divergence of proton beam makes the biggest difference.

o   Fern created summing script – continuously sums events from the old spectrometer to help with signal identification in high background

o   Todo: Fern to produce background numbers/plots (variation, signal:noise, energy spread) and compare with David’s simulations

 

-              Magnet lookup tables

o   Typical dipole settings for beam energy / position on screen

o   Quadrupole settings for beam energy / plasma length

o   Todo: David to produce these

 

-              Expectation for emittance

o   Event candidates have been identified from October 23 and April 24 data

o   Todo: Fern (support from David) to analyse

 

-              CLEAR

o   Experiment conducted April 22nd – 26th

o   Knife edge experiment enhanced and performed in detail

o   Todo: Fern to analyse data. Edda states this is low priority for now, due to more pressing tasks ahead of run3.

 

-              AOB

o   Marlene submitted cabling list with Eloïse

o   David sent emittance paper to collaboration comments until May 20th

o   Fern working on New Spectrometer DQM (highest priority)

o   Dipole logging current to event builder issue resolved

o   UCL plan to write a technical paper on spectrometer upgrades

There are minutes attached to this event. Show them.