1–6 Jul 2025
Omni Boston Hotel at the Seaport
US/Eastern timezone

Sat-Mo-Or6-02: Test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies for the High Luminosity LHC upgrade

5 Jul 2025, 11:30
15m
Momentum EFG

Momentum EFG

Speaker

Guram Chlachidze

Description

The US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab’s horizontal test facility.
Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.

Authors

Alfred Nobrega (Fermi National Accelerator Lab. (US)) Mr Antonios Vouris Charles Rafael Orozco Darryl Orris (Fermi National Accelerator Laboratory) Giorgio Ambrosio (Fermilab) Giorgio Apollinari (Fermi National Accelerator Lab. (US)) Guram Chlachidze Joseph DiMarco Maria Baldini (Fermilab) Michael Anerella Paolo Ferracin Roger Jon Rabehl (Fermi National Accelerator Lab. (US)) Sandor Feher (Fermilab) Soren Prestemon Stoyan Stoynev (Fermilab) Vlad Nikolic (FERMILAB)

Presentation materials

There are no materials yet.