Conveners
News from other facilities
- Ismael Martel (University of Huelva (ES))
-
Bertram Andreas Blank (Centre National de la Recherche Scientifique (FR))27/11/2024, 16:15Invited (In person)
DESIR, the low-energy facility of GANIL/SPIRAL2 is presently in its construction phase. It will provide users with high-quality exotic beams at energies up of 60 keV. The physics case is centred around three pillars: laser spectroscopy with the LUMIERE facility, ion trapping within DETRAP and the beta-decay experiments grouped in the BESTIOL collaboration. The experiments will address topics...
Go to contribution page -
Shane Wilkins (Massachusetts Institute of Technology)27/11/2024, 16:45Submitted oral (In person)
Presented on behalf of the BECOLA-RISE Collaboration.
Investigating the properties of atomic nuclei through measuring their influence upon bound electrons is a powerful and well-established approach in modern nuclear physics [Yan23]. By measuring the hyperfine structure and isotope shift in the atomic structure of radioactive nuclei, nuclear spins, magnetic dipole and electric quadrupole...
Go to contribution page -
Tanvir Sayed27/11/2024, 17:00Submitted oral (In person)
TRIGA-Trap is a high-precision, double Penning trap mass spectrometer located in the reactor hall of the TRIGA (Training, Research, Isotopes, General Atomic) research reactor in Mainz, Germany. Masses of actinides including $^{244}$Pu, $^{241}$Am, $^{243}$Am, $^{248}$Cm, and $^{249}$Cf have been measured using the Phase-Imaging Ion-Cyclotron-Resonance (PI-ICR) technique, achieving...
Go to contribution page -
Santiago Ramos Garces (CoSysLab, Department of Electromechanics, University of Antwerp (BE))27/11/2024, 17:15Submitted oral (In person)
This contribution presents the results of an experimental test for the automatic tuning of a FEBIAD ion source and electrostatic beamline elements, performed at the OFFLINE 2 facility at ISOLDE. The algorithms were developed for the automatic tuning of the ISOL@MYRRHA facility at the Belgian Nuclear Research Centre and were adapted for testing at the OFFLINE 2 facility. The integration of...
Go to contribution page