GF SPS-POP meeting
CERN
● Status & Updates
participants:
Fred Galeazzi
Aurelien Martens (IJCLab)
Witek Krasny
Christian Carli
Wiesław Płaczek
Yann Dutheil
Alexey Petrenko
. Laser presentation by Aurelien. 700kW reached in a 2-mirror cavity. Preparation of tender for amplifier and pulse picker
. ECR for pillar installation in SPS. Presentation by Frederic Galeazzi. Final position of the pilar must be decided now to be included in the ECR. Discussion on the space left to insert the optical cavity in the end has been triggered. Space left is found to be of 1.4m between pillar and optical cavity. Discussions with Edu (excused today) will be made to conclude.
. Contribution to the ESPP from PBC is under preparation with a contribution from Gamma Factory of about a page.
La contribution à l'ESPP semble aussi avoir beaucoup progressé.
. Studies of subcritical reactor to transmute nuclear waste is submitted to journal. Studies on magnetic field at the laser/beam interaction point progressed also, paper in preparation.
. Alexey reminded the audience about the interest of diagnosing visible photons produced at the interaction point in the orthogonal directions of the beam propagation. Related integration studies must be performed.