PS/SPS User Meeting

Europe/Zurich
Zoom (Zoom)

Zoom

Zoom

Eva Barbara Holzer (CERN), Martin R. Jaekel (CERN)
Description

Minutes of Meeting 

The template for the minutes of meeting for the weekly PS & SPS users meeting can always be found using this link: https://codimd.web.cern.ch/0aHs5uqmSPuII76-SaaQdg

Please pre-fill them before the meeting with a summery of your activities!

PS-SPS Users Meeting for Week 36 held on September 4th 2024

Coorinator for this week : Babara E. Holzer

  • September 4th: User meeting exceptionally on Wednesday on zoom only (05.09 is CERN holiday).
  • Updated user schedule v3.2.0.
  • Please get in contact, if you want to take one of the weeks without assigned main user - Tanja (tetiana.shulha@cern.ch) is collecting all requests.

News from the PS & SPS Physics Coordinator

E.B. Holzer, M.R. Jäkel

Proton Run 2024

  • AD/ELENA Physics Stop Monday 02.12.2024
  • SPS NA Physics Stop protons Thursday 31.10.2024
  • PS EA Physics Stop protons Wednesday 27.11.2024

Ion Run 2024

  • SPS NA Physics Start 4.11.2024
    Stop Pb ions Monday 2.12.2024 (6h)
    • NA : Week 45-47 high energy
    • NA : Week 48 low energy (no LHC running)
  • PS EA Physics Start 6.11.2024 (tbd)
    Stop Pb ions Monday 2.12.2024 (6h)
    • CHIMERA: 13.11-2.12

Reminder: Beam time exceeding the limits of 2 weeks PS beam time and 1 week SPS beam time per year need the approval of one of these CERN committees: SPSC, LHCC, DRDC, INTC, RB or IEFC. Consider joining a DRD collaboration, if you require more beam time.

New opening : H8 main user week 36 & 37.
Please contact sps.coordinator@cern.ch if you have a proposal to use this beam time.

Target intensities:
See here or via ASM (accessible from within the CERN network).

News from the Facilities Operations Meeting (FOM) (M.R. Jäkel)

Upcoming SPS MDs next weeks :

https://be-dep-ea.web.cern.ch/content/md-planning-north-area
Dedicated SPS MDs - if not anounced differently - are taking place from 8:00 to 18:00

  • Previous revious Week 35: Crystal shadowing (beam to TT20 TED) →lost half of the MD
  • Week 36: hysteresis compensation MD (no beam to North Area)
  • Week 37: Crystal shadowing
  • Week 38: No dedicated MD
  • Week 39: Slow extraction with transverse noise + TT20 optics (beam to P42)

PS Machine Report (Y. Dutheil)

  • Meyrin electrical fault on Monday at 12:10
    • required a repair on the linac source
    • Beam came back to the PS on Tuesday ~5am
    • Strongly degraded conditions and slow recovery until the afternoon
    • Nominal conditions back for all beam ~3pm
  • EAST-N back to 24GeV

SPS Machine Report (A. Spierer)

  • Availability from Thu to Wed: 78% overall, 87.6% AWAKE, 83% NA
  • Main Faults:
    • Power cut in Meyrin on Monday 12h10, beam recovered from injectors at 6h10 on Tuesday.
    • Access in the PS on Tuesday from 11h to 13h.
    • Injection Kicker on Wednesday 9/4 from 3h40 to? Experts working on it.
  • On Tuesday the long parallel MD was replaced by a short parallel one (after the power cut recovery).
  • Next week program: AWAKE run, standard MD week.

Safety (J. Devine and M. Jankowski)

  • New colleague in the EP Safety Office, Marcus. You will be seeing him doing ISIEC inspections soon.
  • Reminder that the EP Safety Office is closed tomorrow (CERN holiday), we can do ISIEC inspections either today or on Friday.

nToF (M.Bacak and P.M.Milazzo)

Smooth data taking in all experimental area.
EAR1: 238U(n, g)
EAR2: 88Zr(n, g)
NEAR: Activation measurements

Measurements are profiting of dedicated intense proton beams.

East Area Beam Status (M. van Dijk)

On call phone number: 67500

T09: Some issues with BHZ031 trips at 15 GeV/c operation (852A). On 03.09., a dedicated test on this converter during the PS stop was done. Some parameters have been changed and now the converter is to be monitored.
T10: Good operation.
T11: No user.

East Area Users Tour de Table

T8 Main: IRRAD/CHARM (F. Ravotti)

Good week. POT above the reference intensity for T8 (~2.5e16 p/w, see plot below). During the day we will update the plot including the CHARM target TID. Target was removed during the beam stop at the beginning of the week. The centering of the T8 beam on the horizontal plane was less good than the previous nine weeks: ~85% for this W35 against >90% in W26-W34.

We are in access today from 9:00. in IRRAD, after the summer weeks where we run mosty the long irradiation experiments, now we have several short one in the pipeline (FOS for ITk, LHCb PicoCal, ALICE FoCal SiPM, CMS HGCAL, etc.). Some of these we are installing today. In CHARM we are exchanging test setups for TE-MPE and SY-EPC. In CHARM we are also testing several types of RFID tags to study their radiation tollerance in the framework of the EU-funded AIDAinnova project.

The RP week (September 18-25) is confirmed and during this period T8 will request a reduced duty-cycle (e.g. we will need less spills than usual, details in the coming weeks). Also the cryogenic run in IRRAD is confirmed from mid-october till the end of the proton run.

T9 Main: EIC ePIC LFHCal (F. Bock)

Good week over all. First part of the campaign finished using HGCROC read-out. Now switching to CAEN read-out. Should be done with the switch by mid-day.

T9 Incoming Main: SHIP (Week 37) (Please Put Your Name Here)

T10 Outgoing Parallel: BE-EA (D. Banerjee)

Successful test with 15 GeV/c proton beam on target and 0.8 s flat top. Beam composition scans taken at 3, 6, 8, and 10 GeV/c. Results are being summarised.

T10 Outgoing Main: BI XBPF (Please Put Your Name Here)

T10 Main: ALICE ITS3 (Paolo Martinengo)

Useful parasitic run, reconfiguring set-up

T10 Incoming Main: BL4S (Week 37) (Seyma Esen)

  • Visit of winning student teams following our test beam in July 2024.

  • Setup:

  • Qualification. Calibration and Characterisation of two detectors built by the student teams

  • Mostly interested in muon beams at 1, 2, 4.5 and 7 GeV, other beam energies and/or tests with mixed beams if needed and time allows

  • Safety inspection scheduled for Thursday, September 12th 09:00


North Area Beam Status (M. van Dijk)

On call phone number: 67500

Target Sharing (also available via ASM, accessible from within the CERN network)

T2 T4 T10 T6 Date
30 54 21 30 19.08.
30 54 21 150 11.09.

General: Problem with public network (GPN) in the North Area on Monday. At some point the network was completely off, so the beam was stopped for about an hour as nobody was able to take data. This also affected the telephones and terminal computers in the control room.

H2/H4/H6/H8: Good operation.
P42/K12: Good operation.
M2: Good operation. The trips in the MS2 MBPL magnet came back on 03.09. (4 trips). This magnet is planned to be thoroughly checked after the deinstallation tomorrow. Low momenta muons checked down to 40 GeV/c.

AWAKE (M. Bergamaschi)

Week 35:

  M T W Th F S S
SPS extractions to AWAKE 129 456 MD 154 1028 1059 1146
Hours of beam to AWAKE 1.3 3.3 MD 2.4 7.4 6.3 7
Hours requested 1.3 3.4 MD 3 9.5 8 9.5

Detailed program:

  • Monday: Electron beam trajectory tests, proton bunch diagnostic checks
  • Tuesday: Plasma and laser checks, protons in plasma
  • Wednesday: access, minor fixed on diagnostics
  • Thursday: test on bunch compression with SPS-RF experts
  • Friday: Acceleration studies at 2e14 1/cc plasma density, LHC fill +RF intervention in the morning no beam for 2h
  • Saturday: Acceleration studies at 4e14 1/cc plasma density
  • Sunday: Acceleration studies at 2e14 1/cc plasma density, power glicth injector/SPS down for less the 15min and later LHC fill

Week 36:

  M T W
SPS extractions to AWAKE 257 MD MD
Hours of beam to AWAKE 2.4 MD MD
Hours requested 8 MD MD

Detailed program:

  • Monday: Acceleration studies at 4e14 1/cc plasma density, interrupted by power done Meyrin
  • Tuesday: Electron in plasma studies
  • Wednesday: access, ebeam maintenance

North Area Users Tour de Table

P42-K12:

NA62 (Sergey Kholodenko)

  • Very stable data-taking during Friday and week-end
  • From ~02h00 Monday (02/09) start experiencing issues which block data-taking (~05h00 became obvious that it’s related to the network).
  • no data-taking:
    – from 02h00 02/09 until 06h35 03/09
    – from 03h35 04/09 (ongoing)

M2:

Main: NA64mu (Please Put Your Name Here)

Incoming Main: MUONE (Week 37) (Carlo Ferrari)

  • Will install three tracking stations full of Pt-2S modules (18) and the small ECAL.
  • Plan to test a prototype of Sci-Fi for Muon ID (downstream the ECAL)
  • Test of the integrated DAQ (trackers + ECAL)
  • ISIEC submitted
  • Laser survey and metrology involved
  • Desy table and internal transport booked

H2:

Outgoing Main: FASER PRESHOWER (Lorenzo Paolozzi)

  • Excellent beam for most of the week. 200 GeV electron with high purity.
  • Tested the entire readout chain for the detector plane, worked as an effective test run in preparation for the next week of test in October.

Main: ALICE FOCAL (Tommaso Isidori)

  • Test of FoCal-H H2GCROC based readout. FoCal-H is a 9 modules (6.5cm2 x 110 cm) detector for a total of ~400kg. The detector will be hold on a special aluminum bar on top of the DESY table.
  • Test of FoCal-E pixel layers prototypes. Prototyoes inherited by pCT design, they are hosted inside a movable stack of tungsten absorbing layers. Measurement of the shower profile and containment while applying back bias on the sensors.
  • The Setup will be on top of the concrete platform next to the Nikhef frame. The beam pipe will have to be extended closer to the detector surface
  • Beam request:
    • Hadrons: 60 - 400 GeV
    • Electrons: 20 - 350 GeV
    • rates: 10^4 - 10^5
  • Misc. request:
    • tables for power suppliers and electornics
    • 19-inch rack
    • large control room (~10 people during shifts)

Incoming Main: CMS HGCAL (Week 37) (Please Put Your Name Here)

H4:

Main: NP04 (Christos Touramanis)

Smooth data taking since last meeting. Doing further integration work during beam-down times, e.g. ionisation laser full integration into TDAQ in recent days. We will continue at 1 GeV until the end of our run on 16 September.

H6:

Outgoing Main: ATLAS ITK PIXEL (Andre Rummler)

(Sorry, can not stay connected as I have to join the TIOC at 1100.)
After some start-up issues we took very successfully a lot of data with two irradiated 150um Micron RD53B quads at 0° and 15° inclination as well as the with a Micron 100um SCC and HPK 150um quad, both ItkPixV1, at 0°. Bias voltages as well as tuning thresholds were varied. ToT studies were conducted. Unfortunately, after changing to 15°C the two V2 showed bad communication which occurred already previously and has to be debugged offline. Measurement with them will be continued during the next test beam. Tuning software was updated improving some errors. Due to issues with the third batch we dismantled already yesterday night and I handed over this morning to ITk strips.

Main: ATLAS ITK STRIP (John Keller)

Setup is ongoing. Samples have arrived from IRRAD. We will run with Mimosa and Alpide telescopes, and TimePix as a timing plane.

Incoming Main: ATLAS BCM PRIME (Week 37) (Please Put Your Name Here)

Incoming Parallel: ATLAS HGTD (Week 37) (Djamel Boumediene, Stefano Manzoni)

  • Testbeam for the next two weeks aiming to test LGAD+ASIC (ALTIROC3, pre-production ALTIROC-A) hybrids non-irradiated and irradiated.

  • Beam request: pions 120 Gev, 1-2 cm2, intensity ~10k particles/spill

  • H6A material: TLU, Cold box, Aconite telescope, FEI4, Nitrogen

  • Expected commissioning in 1 day, ISIEC submitted

Incoming Parallel: CMS PIXEL (Week 37)(Please Put Your Name Here)

H8:

Outgoing Main + Incoming Parallel: DRD6 IDEA DRC (Week 37) (Please Put Your Name Here)

Main: CMS PPS (F. Garcia)

The setup consists of three platforms: The Triple GEM tracker, the ETLROC tracker and the Trigger and Diamonds platform.

The ETLROC tracker is the new platform on this test beam. The two others are already from the beggining of the year and already inspected before.

The beam required is: Pions at 180 GeV/c with a beam spot of 10-12 mm RMS for both planes.

The installation is now going on and expected safety inspection scheduled at 16:30

Incoming Parallel: BI XBPF (Week 37) (Please Put Your Name Here)

Parasitic Users

H6: ATLAS MALTA (Please Put Your Name Here)

H6: CMS MTD ETL (Murtaza Safdari)

We will be running two setups again this week, with one setup (3 plane telescope) mounted to the AIDA telescope PI stage. This will be used to extract some time reoslution data from new ETROC2+LGAD assemblies with 120 GeV pions.

In addition, the usual 4 plane suitcase style telescope will be placed in H8 along with the PPS team to continue the bias scan of ETROC2+LGAD assemblies with 180 GeV pions.

H8: STRAW TRACKER RD (Please Put Your Name Here)

H8: BI XBPF (Please Put Your Name Here)

T10 Outgoing: ALICE ITS3 (Please Put Your Name Here)


AoB

Minutes by the respective speakers, edited by E. B. Holzer, M. Jäkel, T. Shulha, and M. Schwinzerl

There are minutes attached to this event. Show them.
    • 10:30 10:36
      News from the PS & SPS Physics Coordinator 6m
      Speakers: Eva Barbara Holzer (CERN), Martin R. Jaekel (CERN)
    • 10:36 10:39
      PS machine report 3m

      Members of be-dep-ps-coordinators can upload material.

      Speakers: Alexander Huschauer (CERN), Alexandre Lasheen (CERN), Bettina Mikulec (CERN), Denis Gerard Cotte (CERN), Ewen Hamish Maclean (CERN), Ruben Garcia Alia (CERN), Yann Dutheil (CERN)
    • 10:39 10:42
      SPS machine report 3m
      Speakers: Arthur Spierer (CERN), Carlo Zannini (CERN), Francesco Maria Velotti (CERN), Giulia Papotti (CERN), Kevin Shing Bruce Li (CERN), Michael Schenk (CERN), Pablo Arrutia (CERN), Stephane Cettour Cave (CERN), Tom Levens (CERN)
    • 10:42 10:45
      Safety / Radiation Protection 3m
      Speakers: Alex Schouten, Evelyne Dho (CERN), James Devine (CERN), Jean-Francois Gruber (CERN), Laura Jayne Rowland (CERN), Letizia Di Giulio (CERN)
    • 10:45 10:48
      nTOF 3m
      Speakers: Alberto Mengoni (ENEA & INFN, Bologna), Michael Bacak (The University of Manchester (GB)), Nikolaos Patronis (University of Ioannina (GR))
    • 10:48 10:51
      East Area Beam Status 3m
      Speakers: Bastien Rae (CERN), Dipanwita Banerjee (CERN), Johannes Bernhard (CERN), Maarten Van Dijk (CERN), Michael Lazzaroni (CERN), Nikolaos Charitonidis (CERN)
    • 10:51 11:09
      East Area Users Tour de Table 18m
      • T8 Main: IRRAD/CHARM 3m

        T8 Weekly Proton Intensity:
        https://ps-irrad.web.cern.ch/ps-irrad/documents/int/weekly_intensity_until_week.png

        T8: Accumulated Proton Intensity:
        https://ps-irrad.web.cern.ch/ps-irrad/documents/int/histogram_intensities_until_week.png

      • T9 Main: EIC ePIC LFHCal 3m

        Members of the ps-sps-users e-group can upload material

      • T9 Incoming Main: SHIP (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • T10 Outgoing Parallel: BE EA 3m

        Members of the ps-sps-users e-group can upload material

      • T10 Outgoing Main: BI XBPF 3m

        Members of the ps-sps-users e-group can upload material

      • T10 Main: ALICE ITS3 3m

        Members of the ps-sps-users e-group can upload material

      • T10 Incoming Main: BL4S (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

    • 11:09 11:12
      North Area Beam Status 3m
      Speakers: Anna Baratto Roldan (CERN), Bastien Rae (CERN), Dipanwita Banerjee (CERN), Johannes Bernhard (CERN), Michael Lazzaroni (CERN), Nikolaos Charitonidis (CERN)
      • Status of H2, H4, H6, and H8 Beamlines 3m
    • 11:15 11:18
      AWAKE 3m

      Members of the ps-sps-users e-group can upload material

    • 11:18 12:00
      North Area Users Tour de Table 42m
      • K12 Main: NA62 3m

        Members of the ps-sps-users e-group can upload material

      • M2 Main: NA64mu 3m

        Members of ps-sps-users e-group can upload material

      • M2 Incoming Main: MUONE (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • H2 Outgoing Main: FASER PRESHOWER 3m

        Members of the ps-sps-users e-group can upload material

      • H2 Main: ALICE FOCAL 3m

        Members of the ps-sps-users e-group can upload material

      • H2 Incoming Main: CMS HGCAL (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • H4 Main: NP04 3m

        Members of ps-sps-users e-group can upload material

      • H6 Outgoing Main: ATLAS ITK PIXEL 3m

        Members of the ps-sps-users e-group can upload material

      • H6 Main: ATLAS ITK STRIP 3m

        Members of the ps-sps-users e-group can upload material

      • H6 Incoming Main: ATLAS BCM PRIME (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • H6 Incoming Parallel: ATLAS HGTD (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • H6 Incoming Parallel: CMS PIXEL (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • H8 Outgoing Main + Incoming Parallel: DRD6 IDEA DRC (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

      • H8 Parallel: CMS PPS 3m

        Members of the ps-sps-users e-group can upload material

      • H8 Incoming Parallel: BI XBPF (Week 37) 3m

        Members of the ps-sps-users e-group can upload material

    • 12:00 12:06
      Parasitic Users 6m

      Reporting is not obligatory,
      Members of ps-sps-users e-group can upload material

      • H6: ATLAS MALTA 3m

        Members of ps-sps-users e-group can upload material

      • H6: CMS MTD ETL 3m

        Members of ps-sps-users e-group can upload material

      • H8: STRAW TRACKER RD 3m

        Members of ps-sps-users e-group can upload material

      • T10: Outgoing ALICE ITS3 3m

        Members of the ps-sps-users e-group can upload material

      • H8: BI XBPF 3m

        Members of the ps-sps-users e-group can upload material

    • 12:06 12:09
      AOB 3m
      • Eurolab TA 5m