- Compact style
- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Presents:
Claudia, Tomasz, Didier, Jean-Louis, Frederic A., Melania
1 LS3 Modifications
() P42 dump installation ( in operation after LS3; it will be disinstalled once BDF facility will be in operation )
() RP monitor will be placed at the TCD85-> TCC8 sector door
() those will imply a temporary modification ( (inhibition?) of TCC8/ECN3 interlocks) of the safety chain
2 XTAX and (eventual) beam stopper in TCC2
Action: Jean-Louis and Melania to check with Dipaniwta:
a what exists now ( hardware and logic)
b what it is needed to be operation after LS3 for the complete installation
3. P42 dump
to be assessed with Rui the safety logic (action: Melania)
a is the P42 dump cooling is related to people safety or machine protection only?
b. in case shall an additional magnet interlock been added to the safety chain
4. EN-AA preliminary feedback on timeline and feasibility
Phase 1:
LS3 Dismantling and decabling - it can be carried out, no impact on resources
P42 dump - it can be carried out, no impact on resources
TDR contribution (until end of 2025) - resources shall be further checked with EN-AA management
Phase 2: project execution - resources shall be further checked with EN-AA management
5. Access flow in ECN3 - TCC8 ( point from Fred)
@Fred, can you please describe it in details so that we don't forget to assess it?
Follow up in a month time: meeting to be organised ( action: Melania)