91st Impedance Working Group meeting (CMS, TCSPM, Crystals, RF Bypass)
ACTION for Leonardo: remeasure a couple of damage blocks and check the conductivity (TCSPM)
ACTION for Carlotta: recheck the before/after pictures, as there seems to be a damage that evolved (TCSPM)
ACTION: estimate the impact of the proposed bellows (CMS)
ACTION for Chiara: check also the Roman pots and the transitions (TWOCRYST)
There are minutes attached to this event.
Show them.