TDIS measurements:
- Conclusion: no obvious non-conformity from the two TDIS measurement. Improvement of using shielded probes but does not seem a game changer.
- ACTION: for Carlo and Leonardo and Jintao: check that the 200 MHz mode was measured on the TDIS with identified bad contacts
- for IWG: measure the effect of shielding the probes in a simple structure (frequency range, amplitude, impact of changing the geometry)
BBLRC:
- follow up the feasibility of the cardan bellow (sergio)
- get the global layout including transitions to the existing pipes
- see if modes at 2 GHz can be damped
septum 16
- get transverse assessment
- check feasibility of copper coating as not easy
There are minutes attached to this event.
Show them.