- BSRT
- expect very small change with respect to currently installed (studies of Manfred with similar technology, but not same producer), and current system is ok
- possible mitigation to retract the mirror (divide temperature increase by more than factor 2)
- LHC Wire scanner
- provide longitudinal stability
- check transverse stability
- check eigenmode
- check impact of wire + cables
- check need for feedthrough
- Vacuum modules
- check longitudinal and transverse stability
- get WP2 and WP4 to give opinion on gain vs risk
There are minutes attached to this event.
Show them.