Help us make Indico better by taking this survey! Aidez-nous à améliorer Indico en répondant à ce sondage !

ad-hoc BLM Thresholds Meeting (Pb quench test)

Europe/Zurich
Zoom Meeting ID
67095226515
Host
Belen Maria Salvachua Ferrando
Useful links
Join via phone
Zoom URL

R.Bruce, P.Hermes, C. Hernalsteens, S. Morales, B.Salvachua 

After reviewing the expected maximum power loss allowed by the Master Thresholds (about 60kW in channeling) and the expected modifications for allowing 100kW in Channeling we agreed to stay with the present master thresholds and only change the Monitor Factor before the test. 

There are minutes attached to this event. Show them.