Room 112/R-028
Agenda of the visit Quick tour of the design office Update on cryomodule design
-design update of the tuner actuator -step of assembly -specific checks during assembly
Room 30/2-005 + visit Bldg. 113
Discussion on vacuum equipment for WP4 - Room 30/2-005 Visit of vacuum lab and assembly workshop
Room 376/1-020
Tour of the Mecahnical LAB - 376 Discussion of practical use of Optical fiber during FPC redressing Assembly step and intermediated checks
Bldg. 72
Bldg. 926 (Prevessin)
Bldg. 864 (prevessin)
Visit of the RF workshop Visit of Point 3 amplifiers
CM Testing bunker SRF Preparation area (Cleanroom, CM assy area)
Workshop meeting room 72/1-044