ECAL could be commissioning for KEK beam line in May or June
- Need to discuss Jianbei, May-June would be busy. Summer is preferred.
- USTC takes care of local commissioning locally, then ship it to Japan?
- Wataru mentions we need experts for electronics in person at KEK
- Needs input: the earliest date for the shipment from USTC to Japan
Veto system
- Scintillator would not be a big problem.
- How to combine trigger with HCAL. We can not use the current FASER logic.
- Need inputs: the existing HCAL trigger logic, as well as ECAL one.
- Allowed distance? Between detector and electronics. The cables are about 3 m.
- Need to ask an electronics expert it could be extended. Also, their sizes.
MISC
- In-person: the end of February or 1st week of March?
- At EHN1, which is the commissioning area at CERN SPS area, the horizontal muon “beam” is available.
- Though normally, test with cosmic
- Next online meeting: 6th February, 23rd 10pm JST/ 9pm CST/2pm CET