HL-LHC Integration Meeting: Vacuum Bakeout/Control patch-panels and cables trays for the area TAXN - D2, Follow-up on “Lessons learned on IT String relevant for HL-LHC installation #1, #2 and #3”, and HL intervention in TI2/UJ22 during EYETS 24-25 follow-up.