IBDRS LS4 vacuum and radiations
Present: Jose Somoza, Abel Gutierrez, Matteo Cecchetto, Giuseppe Lerner, Ana Bernardes, Stefano Marzari
- About the possibility to move Vacuum racks to the future IBDRS technical room:
- Abel confirms that the place for 6 (4 +2 spare racks) is enought, also in case of mooving the racks for the Turbo pumps
The first floor of the building B.738 will be not be compatible with sensitive electronics equipment, as the level of Gy will be 3 or 4 order of magnet above the acceptable level (>10Gy/year). The level inside the niche is expected to be around the same order of magnitude. To be confirmed on the next R2E simulation.
- Discussion about radiation level into the future "niche" on top of the target area:
- Actual FE pumps are not produced anymore. Inside Faraday cage, the level of radiation is around 1MGy/year. Vacuum pumps survival is a concerned for future FE. FE will not be changed during LS3, but an important maintenance is foreseen as FE will have to survive until LS4 (2034). Jose/Stefano to discuss the best plan for vacumm maintenance with Joachim.
- For LS4, there is 2 possibilities (standard one deported in B.738 or more rad-hard but expensive in same location). The goal is to avoid buying rad-hard pumps by moving the pumps in B.738 where level of radiation is lower but not zero.
- Jose said all the modern turbo pumps have some electonics on the pump and will be sensitive to radiation. PS pumps are running since 2 years with a level of radiation around 100 Gy/year but there is no guaranty. From simulation, level of radiation inside the building will exceed 10Gy/year.
- R2E action: Plan a monitoring in the future location of the niche with RPLs or Radmon. The collected data will be used by TE/VSC to decide the best option for LS4. The possibility to test in equivalent radiation field one (or more) pump has been discussed (into IBDRS shielding or elsewhere at CERN) and should be decided later.
- New R2E simulation (Matteo):
- Matteo to see with Fabio the geometry was already simulated and optimized by Alice (action Matteo)
- Contact Fabio to recover adjusted Fluka geometry and discuss the previous simulation done by RP on Boris tube, niche...
- Add to the R2E simulation the room 170/1-010, 12, 14, 16. This room if full with electonics device. (main sources coming the 2 Boris tubes openings)
- Identify the level of radiation in the niche at Floor level, to check if there is an impact on the level of radiation.
- Notify results of simulaiton to Ana-Paula and Stefano when ready
Kind regards,
Stefano
Correction from José after the meeting:
“PS pumps are running since 2 years with a level of radiation around 100 Gy/year but there is no guaranty” => The example was not a pump, but a gas dosing valve. It was tested up to 200 Gy (gamma). It is able to survive in PS with tenths of Gy/year. Single events are the still an issue, but the probability is low enough to have a replacement every 1-2 years. The valve is part of a system not essential for operation, so its failure is not an issue.