EAM/AFT Linking Plug-In - workflow for 2025

Europe/Zurich
30/7-010 (CERN)

30/7-010

CERN

30
Show room on map
Zoom Meeting ID
67851940355
Host
Lukas Felsberger
Useful links
Join via phone
Zoom URL

Main discussion points:

  • The linking plug-in and proposed workflow was discussed
    • test example - https://testeamlogbook.cern.ch/LBQLHC/log2/122051
  • for activating the linking plug-in and sharing feedback EAM support should be contacted - eam.support@cern.ch
  • For systems under the TIOC umbrella a separate discussion will be held mid-march to agree on an internal workflow and linking
    • to be kept in mind that TIOC is not using EAM logbook yet but it is under development, EL & CV partially use it
    • main discussion point is whether the TIOC event links to AFT or the equipment group event - from AFT perspective it is important that link to relevant information exists
  • CV pointed out that an eventual automatic creation of EAM logbook entry from AFT side would be very useful - in comparison to EL they also do not have the situation where multiple machines are impacted by a single problem (as is the case with electrical perturbations)
  • For the EL PMU/perturbation monitoring use case, it needs to be reviewed whether the events should directly populate AFT (but only for the beam impacting sub-set) or rather to EAM (for all events) and those impacting the beam linked to AFT. A discussion for that is foreseen mid-March.
  • for CRG the use-case for the linking plug-in is not so clear yet
  • it was agreed to try out the plug-in for some key scenarios and provide the feedback for both the integration development and to identify the best workflows
  • a follow-up meeting is foreseen in Q2 2025 to discuss experiences made so far
There are minutes attached to this event. Show them.