Gas systems weekly project meeting

Europe/Zurich
32/1-A24 (CERN)

32/1-A24

CERN

40
Show room on map
gas systems project meeting
Zoom Meeting ID
62095888225
Host
Beatrice Mandelli
Useful links
Join via phone
Zoom URL

piquet:

24/4

CMS-RPC Purif 3 not reaching phase2 --> ELOG - Purifier 3  two times --> CHECK & TICKET

ATLAS-TGC liquid level difference --> follow-up  [GASSYSTEMS-603] TGC problem with n-penthane tank level measurement - CERN Central Jira

-2nd liquifier:

some doubt on good functioning

not well insulated (liquid exits at 10 C higher temperature)

-purge gas in level sensor

ATLAS-RPC mixer iso alarm from IR --> ELOG - RPC mixer

 

17/4

TGC liquid in trap alarm -> [GASSYSTEMS-601] TGC liquid in trap alarm - CERN Central Jira --> liquid trap temperature increased

LHCb-MWPC Purif CB not cycling

 

10/4

ALICE-MID purifier temperature HH alarm -> [GASSYSTEMS-600] ALICE-MID purifier temperature HH alarm - CERN Central Jira

TGC liquid in trap alarm -> [GASSYSTEMS-601] TGC liquid in trap alarm - CERN Central Jira

 

3/4

CMS-RPC purif 1 not doing vacuum during regeneration [GASSYSTEMS-590] CMS-RPC purif 1 not doing vacuum during regeneration - CERN Central Jira

need to be tested after maintenance of the pump. update ticket.

 

ALICE-TRD Xe recuperation how to inject [GASSYSTEMS-591] ALICE-TRD Xe recuperation how to inject: procedure - CERN Central Jira

 

27/3

MDT humidifier -> Checklist back for all!

 

20/3

CMS-RPC purifier 1 not reaching the pressure for phase 2 --> to check why [GASSYSTEMS-602] CMS-RPC purifier 1 not reaching the pressure for phase 2 - CERN Central Jira

CMS change cap closed-open and ventilation --> for Salvatore e Aleksandar -> it was a mistake from the operator

 

dove sono i ticket di cavern closure dei quattro?

 

checklist dove sono? --> ticket IO [GASSYSTEMS-573] weekly checklists files missing: ATLAS and CMS - CERN Central Jira

--> ATLAS remains to be done

 

TOO MANY ENTRY FOR DATAPOINTS -> 

[GASSYSTEMS-558] ALICE: datapoint archiving too often - CERN Central Jira

[GASSYSTEMS-559] ATLAS: datapoint archiving too often - CERN Central Jira

[GASSYSTEMS-560] CMS: datapoint archiving too often - CERN Central Jira

[GASSYSTEMS-561] LHCb: datapoint archiving too often - CERN Central Jira

 

--> new filr needed [GASSYSTEMS-557] datapoint archiving too often - CERN Central Jira

 

Chiller spares: --> TICKET

disappeared

ALICE no

ATLAS

TGC has spare in SG S/N??? (and S/N in use)

RPC has spare to be send back to company for maintenance --> Mattia S/N (and S/N in use)

CMS

RPC no spare (and S/N in use)

FGR no spare (and S/N in use)

LHCb no

 

 

 

ALICE

70 report from Anité [GASSYSTEMS-70] TPC gas quality - filters to Benoit - CERN Central Jira (I don't see the report, can you please add it?)

TRD leak is still there. [GASSYSTEMS-568] ALICE TRD leak search tests/interventions log - CERN Central Jira

 

 

 

ATLAS

MDT high flow (wrong mixture, CO2 injected instead of Argon): how to spot in advance?

MDT pump: supplier reply? frequency converter? --> Philipp to be informed that some test at some point will be needed [GASSYSTEMS-592] MDT pump: supplier reply? frequency converter? - CERN Central Jira

TGC fill (experience) on April 1st. Still confirmed after the He leak problem? --> [GASSYSTEMS-593] TGC fill: experience summary - CERN Central Jira

check nC5H12 stock -->ticket IO [GASSYSTEMS-574] ATLAS-TGC nC5H12 stock - CERN Central Jira

how many litres?

how many days if we take last year consumption?

Thanks a lot! 

problem with n-penthane tank level measurement -> [GASSYSTEMS-603] TGC problem with n-penthane tank level measurement - CERN Central Jira

ATLAS-TGC flow difference --> [GASSYSTEMS-612] ATLAS-TGC flow difference - CERN Central Jira

heating controllers for ATLAS --> ticket IO -> out od yets & Patrick for cost estimate [GASSYSTEMS-576] ATLAS heating pipe cabinets - CERN Central Jira

ATLAS ID flushing follow up of incident of 10 April --> [GASSYSTEMS-614] ATLAS ID flushing follow up of incident of 10 April - CERN Central Jira  

VERY IMPORTANT:   [GASSYSTEMS-618] ATLAS ID flushing change of gas procedure, dewpoint warning and alarms - CERN Central Jira

add screenshot ID flushing

 

CMS

CF4 pressure sensors for vacuum received --> test needed -> w14 [GASSYSTEMS-577] CF4 absorber new vacuum pressure sensors - CERN Central Jira

--> efficiency is low? check if there is a problem.

R134a insulation - isol'tut to check and see what to do -> ticket IO [GASSYSTEMS-578] R134a insulation - isol'tut to check and see what to do - CERN Central Jira

How much gas flow we need for the RPC purifier? --> OFFLINE with Maria Cristina [GASSYSTEMS-579] CMS-RPC How much gas flow we need for the RPC purifiers? - CERN Central Jira

RPC bypass pump too much closed --> [GASSYSTEMS-604] RPC bypass pump too much closed - CERN Central Jira

RPC H2O ExhToDist    CMSAUX_An_XANA9319AS 159 5000 ppm, but is it not normal? --> [GASSYSTEMS-605] RPC H2O ExhToDist 5000 ppm is ok? - CERN Central Jira

RPC double flow test -> ticket? exists? [GASSYSTEMS-392] RPC test of double the flow in one rack - CERN Central Jira

RPC with CO2 like ATLAS and effect on R134a recuperation -> [GASSYSTEMS-606] RPC with CO2 like ATLAS and effect on R134a recuperation - CERN Central Jira

RPC humidifier lauda --> old is broken?  [GASSYSTEMS-617] CMS RPC Humidifier lauda - CERN Central Jira

GEM chamber pressure alarm for stop -> ticket with GEM responsible [GASSYSTEMS-580] GEM chamber pressure alarm for stop - CERN Central Jira

R134a Upgrade (hardware and software) to be tested -> [GASSYSTEMS-594] R134a Upgrade (hardware and software) to be tested - CERN Central Jira

 

GEM 904 would like to move their mixer to PLC -> ticket already exists. check  [GASSYSTEMS-468] Re: 904 GEM gas system - CERN Central Jira

CSC 904 new panels -> for LS3 -> ticket Andrea? [GASSYSTEMS-581] CSC at 904 - CERN Central Jira

RPC 904 new line -> ticket Andrea? [GASSYSTEMS-582] RPC 904 new line - CERN Central Jira

RPC904 cleaning of lines -> follow ticket [GASSYSTEMS-556] 904 RPC gas distribution panels not working properly - CERN Central Jira

 

 

LHCb

CODEX-b --> purif to be prepared, calibration of O2 and some test  -> ticket? IO [GASSYSTEMS-466] CODEX commissioning - CERN Central Jira

LHCb console in US not working -> to Gianluca [GASSYSTEMS-583] LHCb console in US not working - CERN Central Jira DONE

should we postpone real filling? Patrick to ask Christoph [GASSYSTEMS-584] RICH1: should we postpone real filling? - CERN Central Jira UPDATE

RICH2 CO2 from purifier-> check how to decrease-> ticket IO [GASSYSTEMS-585] RICH2 [CO2] from purifier-> check how to decrease - CERN Central Jira

RICH2 form where the CO2 entered -> from backup? how long was it in stop? -> [GASSYSTEMS-607] RICH2 form where the CO2 entered -> from backup? how long was it in stop? - CERN Central Jira

RICH1 what we learn from 1st fill -> [GASSYSTEMS-608] RICH1 what we learn from 1st fill - CERN Central Jira

for example: RICH1 membrane bypass is a problem?

summary of the C4F10 bottles --> TICKET or ELOG

Patrick, can you put the excel checklist as attachment in the weekly summary?

 

NA62

CEDAR filling planned for April 14th -> [GASSYSTEMS-492] NA62 CEDAR H2 filling - CERN Central Jira  Done 

CEDAR maintenance needed -> [GASSYSTEMS-609] CEDAR maintenance needed - CERN Central Jira

pressure sensors S/N to follow -> [GASSYSTEMS-595] NA62-CEDAR pressure sensors - CERN Central Jira 

 

CHARM test pressure sensors -> [GASSYSTEMS-610] CHARM test pressure sensors - CERN Central Jira

 

non-LHC safety valve --> check lista di Fabio

[GASSYSTEMS-172] non-LHC safety valves to be verified - CERN Central Jira

ELOG - safety valves to be verified for non-LHC systems

 

 

 

Additional requests/projects/discussions

New Gas panels for DRD1 test beam [GASSYSTEMS-586] RE: New Gas panels for DRD1 test beam - CERN Central Jira

887 CEDAR new "mixers" --> [GASSYSTEMS-509] CEDAR for beam lines - CERN Central Jira

 

 

examples of topics for the common discussions:

 

-cms id flushing -> Andrea

-cms r134a operation and spare -> Andrea

-cms cf4 operation and spare -> Andrea

-atl tgc nc5h12 -> Kacper

-Analysis boxes -> LPh

-C4F10 new recuperation installation -> Patrick

 

There are minutes attached to this event. Show them.
    • 09:00 09:10
      Piquet interventions 10m
      Speakers: Gianluca Rigoletti (CERN), persons on piquet
    • 09:10 09:40
      YETS tickets/planning 30m
      Speakers: Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Gianluca Rigoletti (CERN), Kacper Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Patrick Carrie (CERN), Roberto Guida (CERN)
    • 09:40 10:10
      Review new ticket or updated during current week 30m

      Jira dashboard: https://its.cern.ch/jira/secure/RapidBoard.jspa?rapidView=9098&view=detail
      Confluence page: https://confluence.cern.ch/display/KBFGS

      Speaker: Roberto Guida (CERN)
    • 10:10 10:20
      gas systems status during yets 10m
    • 10:20 10:25
      other M&O news 5m
      Speakers: Beatrice Mandelli (CERN), Gianluca Rigoletti (CERN)
    • 10:30 10:35
      Gas mixture analysis for LHC experiments 5m

      https://epdt-gasmonitoring.web.cern.ch/

      Speaker: Maria Cristina Arena (CERN)
    • 10:35 10:40
      FSU planning for coming weeks & Jobs status 5m
      Speaker: Andrea D'Auria (CERN)
    • 10:40 10:50
      Pump working hours, EAM/Infor, maintenance and spare parts follow-up 10m
      Speaker: Miguel Afonso (Universidade de Lisboa (PT))

      any maintenance performed from last Thursday?

      ALICE

      27/3 MID 4201 

       

      ATLAS

      3/4 RPC purif 1 pump

       

      CMS

      27/3 DT 4101 + 4201

      3/4 RPC purif 1 pump

      8/4 R134a compressor

       

      LHCb

      https://eloggas.web.cern.ch/GASSYSOperationMaintenance/6510

      https://eloggas.web.cern.ch/GASSYSOperationMaintenance/6511

       

       

    • 10:50 11:00
      list of projects for 2025 and beyond 10m
      Speaker: Roberto Guida (CERN)
    • 11:00 11:10
      procedures summary 10m
      Speaker: Roberto Guida (CERN)
    • 11:10 11:20
      aob and requests for jobs at workshop 10m
      Speakers: Amin Bouzaiene (Politecnico di Torino (IT)), Andrea D'Auria (CERN), Beatrice Mandelli (CERN), Burkhard Schmidt (CERN), Damiano Galassi, Gianluca Rigoletti (CERN), Kacper Kapusniak (CERN), Louis-Philippe De Menezes (CERN), Maria Cristina Arena (CERN), Mattia Busato (CERN), Mattia Verzeroli (Universite Claude Bernard Lyon I (FR)), Michal Zbigniew Zimny (CERN), Miguel Afonso (Universidade de Lisboa (PT)), Paolo Petagna (CERN), Patrick Carrie (CERN), Pieter Vanslambrouck, Roberto Guida (CERN), Stefania Juks (Université Paris-Saclay (FR))

       

      DAMIANO:

      • R134a Distillation I only see Fabio available but also Abdel is needed for welding volumes/buffers/column (at least one full week). If we do not proritize this part me and Fabio will have to stop at a certain point. So it would be better to have them in parrallel or Abdel first.

       

      CMS-RPC-904

       

      CHARM test

      • pressure sensor test
      • Jo needed April 30 and May 7 . ++

       

      ND280

      • 12x adaptor 1/4" to 6mm (if not already existing on swagelok catalogue) --> Andrea for reference of connector
      • 1 buffer of about 28 cm length and 9 cm diameter --> Damiano for drawing

       

      ABSORBER TESTS

      • fill one purifier cartrige with MolSieve Z10 1-2 mm and measure DP and heat up (to 90 C) and cool down time

       

      MAGASIN

      • start preparing the area in the mezzanine
      • start organising electrical and mechanical spare