Presents: AP Bernardes, A. Boucherie, N. Szczepanik, J. Vollaire, F. Pozzi, C. Cipriani, P. Valentin, G. Cnudde, J. Dauge, I. Zarei, A. Nielsen
See presentation.
The goal of the meeting is to expose proposals for pipes integration into the the first 80cm poured concrete layer (here in yellow).
More detailed study shall be done when a consensus is reached.

Survey line A-B:
- verify with C. Biot the faisability of the corings close to floor - action Valentin
EL pipes reservation:
- No opposition for this proposal
- verify with C. Biot the faisability - action Stefano
- The re cabling is not foreseen during LS3 but during LS4 (Joachim)
- define number and diameters - action Stefano with EL
Drain water pipes and pot pumping:
- CV will include this part into their requirements - action Nina
- Definition of pot volume and water leak detection system - action Nina, Ida, Alex
- The interface with the dump enclosure has to be study - action Ida, Alex
- Find a solution for the drain tube air tightness - action Nina
- Concerning the pumping strategy there is no clear view (Nina in favor of a permanent system, Joachim in favor of a removable system)
- CV proposal for pumping, permanent pump or removable ? - action Nina, Fabio
- Study the routing and connection to the RP tanks into 170-R-403 - action Nina
Dump ventilation:
- intense discussions about this point...
- the air flow has to be defined - action Ida, Alex
- Fabio prefers to have an air release into the faraday cage but more difficult in HRS side because of the Medicis irradiation point niche
- The dump enclosure has to be relatively tight - action Ida, Alex
- The interface with the dump enclosure has to be study - action Ida, Alex
- To preserve the under pressure into 838, no additional or parallel air flow form 738 to 838 is acceptable !
Reserve pipe:
- no justification consensus for this additional pipe reservation for future "rabbit" irradiation point
- organize a meeting with Thierry, Joachim, Marco, Edouard, (Oliver?) and Ana Paula - action Stefano
General tightness:
- Proposal of a integrated square or round pipe between the faraday cage and the dump
- Study the dimensions, tightness and integration of this pipe - action Ida, Alex
- Proposal to pour concrete around this pipe, RP checks - action Claudio
- Study plugs to insert into the Survey openings and RP checks - Action Stefano, Claudio
Various:
- ask an additional quotation to C.Biot for the additional corings - action Stefano
There are minutes attached to this event.
Show them.