Nov 3 – 4, 2011
CERN
Europe/Zurich timezone

Session

Experimental verification

Nov 3, 2011, 2:00 PM
Multiple rooms (CERN)

Multiple rooms

CERN

Conveners

Experimental verification

  • Roberto Corsini (CERN)

Description

There will a general description of the activities and work-packages:
- CTF3 Consolidation & Upgrades (CTF3-001)
- Drive Beam phase feed-forward and feedbacks (CTF3-002)
- TBL+, X-band high power RF production & structure testing (CTF3-003)
- Two-Beam module string, test with beam (CTF3-004)
- CLIC 0 drive-beam front end facility (including Photoinjector option) (CLIC0-001)
- Drive Beam Photo Injector (CLIC0-002)
- Accelerator Beam Systems Tests (ATF, Damping Rings, FACET, etc.) (BTS-001)
- Sources Beam System Tests (BTS-002)

After each work-package there will presentations from the collaborating institutes
- Information needed shown in linked document
- Typically 5-7 min presentation and 5-3 min discussion

Presentation materials

  1. Roberto Corsini (CERN)
    11/3/11, 2:00 PM
  2. Frank Tecker (CERN)
    11/3/11, 2:05 PM
  3. Piotr Krzysztof Skowronski (CERN)
    11/3/11, 2:15 PM
  4. Andrea Ghigo (INFN-LNF)
    11/3/11, 2:25 PM
  5. Prof. Philip Burrows (University of Oxford)
    11/3/11, 2:45 PM
  6. 11/3/11, 2:55 PM
  7. Steffen Doebert (CERN)
    11/3/11, 3:35 PM
  8. Roberto Corsini (CERN)
    11/3/11, 3:45 PM
  9. Roger Ruber (University of Uppsala), Volker Ziemann
    11/3/11, 3:55 PM
  10. Steffen Doebert (CERN)
    11/3/11, 4:05 PM
  11. Dr Fernando Toral (Centro de Investigaciones Energ. Medioambientales y Tecn. - (ES)
    11/3/11, 4:20 PM
  12. Juan Jose Garcia Garrigos (Universidad de Valencia (ES))
    11/3/11, 4:35 PM
  13. Mr gabriel montoro (universitat politecnica de catalunya)
    11/3/11, 4:50 PM
  14. Roberto Corsini (CERN)
    11/3/11, 5:05 PM
  15. 11/3/11, 5:15 PM
Building timetable...