Presentation of the activties and work-packages:
- Integrated Baseline Design and Parameters (CD-BASE)
- Integrated Modelling and Performance Studies (CD-SIM)
- Feedback Design(CD-LUMI)
- Machine Protection & Operational Scenarios (CD-OP)
- Background (CD-BCKG)
- Polarization (CD-POL)
- Main beam electron source (CD-ESRC)
- Main beam positron source (CD PSRC)
- Damping Rings (CD-DR)
- Ring-To-Main-Linac (CD-RTML)
- Main Linac- Two-Beam Acceleration (CD-ML)
- Beam Delivery System (CD-BDS)
- Machine Detector Interface activities (CD-MDI)
- Drive Beam Complex (CD-DRV)
Presentations from the collaborating institutes
- See list below
- Information needed shown in linked document
- Typically 5-7 min presentation and 5-3 min discussion
There will be a series of individual discussions concerning the following workpackages, followed by a common working session at the end:
- Damping Rings Superconducting Wiggler (CTC-WIG)
- Survey & Alignement (CTC-SUR)
- Quadrupole stability (CTC-QUA)
- Two-Beam module development (CTC-TBM)
- Warm Magnet Prototypes (CTC-WPM)
- Beam Instrumentation (CTC-BDI)
- Post-collision line & dumps (CTC-PCLD)
- Controls (CTC-CO)
- RF Systems (1GHz klystrons & DB cavities, DR RF) (CTC-RF)
- Powering (Modulators, magnets converters) (CTC-EPC)
- Vacuum Systems (CTC-VAC)
- Magnetic stray Fields Measurements (CTC-MM)
- Beam Transport Equipement (CTC-BT)
- Creation of a "Technology Center at CERN" (CTC-MME)
Introduction about the activities:
- X-band RF structure Design (RF-DESIGN)
- X-band RF structure Production (PRODUCTION)
- X-band RF structure High Power Testing (TESTING)
- Creation and Operation of X-band High power Testing Facilities (TEST AREAS)
- Basic High-Gradient R&D (HIGH-GRADIENT)
Presentations from the collaborating institutes
- See list below
- Information needed shown in linked document
- Typically 5-7 min presentation and 5-3 min discussion
There will a general description of the activities and work-packages:
- CTF3 Consolidation & Upgrades (CTF3-001)
- Drive Beam phase feed-forward and feedbacks (CTF3-002)
- TBL+, X-band high power RF production & structure testing (CTF3-003)
- Two-Beam module string, test with beam (CTF3-004)
- CLIC 0 drive-beam front end facility (including Photoinjector option) (CLIC0-001)
- Drive Beam Photo Injector (CLIC0-002)
- Accelerator Beam Systems Tests (ATF, Damping Rings, FACET, etc.) (BTS-001)
- Sources Beam System Tests (BTS-002)
After each work-package there will presentations from the collaborating institutes
- Information needed shown in linked document
- Typically 5-7 min presentation and 5-3 min discussion