no news about the supporting tube (CERN workshop, Euromec)
no news about spacers, but they are ordered
Vincent:
removed plastic pieces for centering of the supporting tube - already done by the vacuum tube
protection of spacers serve also as quides during insertion of the supporting tube
sent a file with HV board "design" to Peter
15mm between holes for screws on the HV board
have to add alignment holes on the HV board (possibly between two holes)
sent info to Marija for calculation of the deflection
added ball bearings (Omnitrack) on the supporting tube (flange) to simplify insertion in the vacuum tube
need information about positioning of the vacuum tube in the beam to add alignment holes (8H7) on both sides
gluing system - two supports on the sides, multiple top plates to allow gluing of all straws, alignment with pins; need to finalize the position of holes in relation to the gas manifold
to do list on the last slide
Francois:
we need to look where to order the bearings and springs for gluing
removed a bit of excess material on the welds
Temur:
brought some straws, but they were damaged during the transport (bent or pressed)
128 long straws for next years - no problem
needs 1 roll for tuning of the machine, at least 3 rolls (100 m of straws per roll), 19 um
in Pisa, they have 5mm straws, 20um wire, old Atlas crimping tool, they wire in vertical position with a small weight on the wire during insertion
better to use wire sppol which is not vacuum sealed, rather stored in argon atmosphere to avoid "welding"
should check threshold of elastic-inelastic transition of the wire