To be followed up:
- short prototype - validation, measurements (wire tension, straw straightness, HV, ...), FE board
- Toshiba wire investigation - results
- long prototype - Alu tube measurements - results, update drawings of flanges, launch the production
- Minitubes crimp tubes investigation - results
There are minutes attached to this event.
Show them.