Present: S. Albright, M. E. Angoletta, H. Damerau, A. Findlay, T. Levens, O. Marqversen, B. Woolley
- Follow-up up from last meeting
- Agreed exploitation model for the pick-ups used by RF in PSB and PS
- Follow-up: Heiko to update the tables on the codimd https://codimd.web.cern.ch/Pew9LWP_Q4qIvSIHZ5Hk7A accordingly. -> In progress.
- PSB
- For the phase pick-ups (beam control) a new head amplifier developed by Michele is presently under test on ring 4. New cables have already been pulled to this phase pick-up stack in 1L5 (there are 3 pick-up stacks). Once fully commissioned, it is planned to equip a second stack with the new amplifiers, for which also new cables will have to be pulled (during or post LS3?). Follow-up: BI and RF to agree on cost sharing. -> To be confirmed that new cables will be needed, cost (Michele): 1.5 kCHF for de-cabling, 6 kCHF for cabling, 7.5 kCHF in total for for cables to 8L1.
- Follow-up: BI and RF will try to find out if any spares do still exist for transverse feedback pick-ups (BI) and kickers (RF). Follow-up: BI will check if a special pick-up and head amplifier is still required or if the present situation is only for historical reasons.
- Follow-up: Without a kicker spare, RF to make a CONsolidation request to rebuild a spare, or joint request with BI for pick-up and kicker consolidation.
- Follow-up: RF to confirm that the functionality of the BOSS can be implemented in the digital signal processing of the transverse damper LLRF, at latest with the next generation transverse dampers. -> Confirmed (?).
- PS
- Follow-up: BI to check if the new standard PS head amplifier developed by Michele, would also be suitable for the transverse feedback.
- Follow-up: BI to clarify the spares situation and eventually procure spare hybrids. Follow-up: BI to check the cost of new cables to five location of dedicated radial loop pick-ups (22, 36, 51, 76, 96). BI and RF to find a budget solution to have cables pulled with the recabling campaign of the CODD pick-ups already in the pipeline.
- Global exploitation model
- Equipment responsibility for the chain from pick-up, through head amplifier and cables should be in BI, up to the level of the delivery of the beam signal to RF. This also includes pick ups used for the transverse feedback.
- Operational responsibility, which mainly means exchanging head amplifiers, should be with RF. Spares, repair, any future development, etc. will be taken care of by BI.
- The budget for future cabling activities will be agreed between BI and RF groups on a case by case basis.
- LEIR
- Transverse feedback
- The LEIR transverse feedback uses two dedicated strip-line pick-ups (ER.UDHV41, ER.UDHV42) built by BI and installed some 20 years ago, when LEAR was converted to LEIR for ion. The present responsibility is unclear. Applying the exploitation model, BI should take the equipment responsibility for the pick-ups, the head amplifiers and the cables from the tunnel to the TFB equipment housed in the center of the ring. RF will keep the operational responsibility and the RF piquet will take care of changing the head amplifier.
- RF plans CONSolidation of the transverse feedback, presently mainly focused on the LLRF. The consolidation request document (https://indico.cern.ch/event/1563447/contributions/6585814/attachments/3094110/5499945/CONSOLIDATION-LEIR-DAMPER.docx) should be extended to a joint BI/RF request eventually including the pick-up and the head-amplifier part. BI will clarify if special pick-ups are actually needed for the transverse damper.
- The BOSS units (originally developed by BI) will most likely not be needed anymore with the new digital signal processing. In case they are needed, RF takes responsibility for them.
- RF takes the responsibility of the transverse feedback kickers in LEIR.
- AD
- Beam phase and bunch shape measurements in the ring
- The phase measurement (beam phase loop, Tomoscope, etc.) consists of a combination oftwo resonant AC beam transformers with head amplifiers: DR.USL4104 (high frequency with -3dB points, 600kHz-38MHz) and DR.USL4105 (low frequency with -3dB points, 22kHz-2MHz). Both are combined at the surface by a special summing unit, giving combined bandwidth 22kHz to 30MHz. Spare head amplifiers are available. While the installation was initially developed by RF, it is very similar to other fast beam current transformers (FBCTs) and, as a beam instrumentation device, the equipment responsibility for the existing pick-ups with head amplifiers and cables should move to BI. This makes the summing unit the only component left with RF in the signal path. RF will check the availability of a spare summing unit and spare components before re-evaluating the responsibility. Information after the meeting (A. Findlay, 15/07): A spare SPSU (Schottly pick-up unit) unit and manual power supply card for the PUs are available.
- To evaluate the need of the special pick-ups for the beam phase loop, a joint BI/RF MD will be prepared to check down to which intensity a sum signal from a standard trajectory measurement pick-up could be used and which sensitivity would be needed to replace the resonant pick-ups by a more conventional solution in the mid-term future.
- Intensity and bunch shape measurement at AD-ELENA transfer
- The extraction transformer DE.TFA7049 (low frequency, same as DR.USL4105), already uses the BI TRIC acquisition as the only client. Responsibility for the pick-up, head amplifier and cables should therefore move to BI.
- Transverse feedback/exciter
- The pick-ups initially foreseen for the transverse feedback have been re-purposed and are actually used by the BBQ tune measurement.
- While the low-level drive signal for the beam excitation is provided by BI, RF takes responsibility the downstream installation (amplifiers and transverse kickers).
- ELENA
- Beam phase and bunch shape measurements in the ring
- Based on the concept of AD, a combination of two pick-ups, LNR.APULA.0225 (high frequency) and LNR.APULB.0227 (low frequency) with integrated head amplifiers, was initially foreseen. While the low frequency variant works well, the high-frequency pick-up is not in use. Also the development of the summing unit was left uncompleted. Since the high-frequency pick-up is practically not needed for operation, and seen the resources required to complete it, it is agreed to drop the LNR.APULA.0225 and concentrate on the low-frequency variant of the pick-up. RF will therefore check the spares situation for the head amplifier. In case spares are available, the hand-over of responsibility to BI should be prepared.
- Extracted intensity and bunch shape measurement at AD-ELENA transfer
- The two extraction transformers LNE.APULB.0030 and LNE.APULB.5030 (low frequency, same as LNR.APULB.0227 but lower noise head amplifier variant) already use BI TRIC cards. The hand-over of responsibility should be part of the package with LNR.APULB.0227, again assuming that head amplifier spares can be made available by RF.
- Tune measurement
- A request by ABP was made to BI to increase the strength of the beam excitation for optics measurements. The present RF power for excitation installed is below 1 W. In case an RF power beyond the level of few watts, which can be produced by commercial (e.g. Minicircuits) amplifier modules, will be needed, RF will take care of the responsibility and the exploitation. This will make it consistent with comparable installations in other synchrotrons of the PS complex.
There are minutes attached to this event.