IBDRS visite building 250 pour Target area mock up

→ Europe/Zurich

Presents: Wim Weterings (space manager), Philippe Boichard, Sven de Man, Stefano Marzari

The building 250 can be used as a test and storage area not for Frontends clean assembly, there is a poor heating, during winter the temperature is down to 10°C and in summer is very hot.

After discussion we have 3 possible propositions A - B - C :

Actions:

Proposition B: verify with EL and LEAR the cost of cabling re-routing (Stefano)

Proposition B: verify the cost for metallic structure removal and floor re arrangement (Sven)

Proposition C: verify with BI if we can share the entry area (Stefano)