Beam Instrumentation in the BOOSTER injection region

Not scheduled
1m
30/7-018 - Kjell Johnsen Auditorium (CERN)

30/7-018 - Kjell Johnsen Auditorium

CERN

Meyrin Site Building 30 7th Floor Room 18
190
Show room on map

Speaker

Jocelyn Tan (CERN)

Description

Beam instrumentation is essential for the commissioning phase of the PSB injection zone with the Linac4 beam, and for routine operation later on. The following observables are requested for that purpose: Beam profiles for steering and injection matching. The stripping efficiency is also monitored downstream the foil, in addition to the visual inspection of the foil. A fast machine protection system coupled with beam loss monitors is needed too. In this talk, analysis and solutions based on specifications issued by the machine physicists are proposed by the Beam Instrumentation Group. This very preliminary phase arouse a set of questions which needs deeper investigations.