Proposal of New Nb-Ti bus bars for N1 and N2 Lines of HL-LHC

Europe/Zurich

Actions:

  • We will focus on the design of the new 2 kA cable, 18 kA can be use as is for the main circuit, and for the trim we will replace the 18 kA with the current 2 kA (02M) or the new 2 kA. In parallel, when Simon is back, we will asses the option of producing this in Tratos
  • Angelo and Jerome will contact the company for the upgrade of the machine
  • Susana will do a check on the expected field to confirm the field (self field of the N-Line)
  • Lucie will asses advantages/disadvantages/needs of twisting the bundle from the mechanical perspective
There are minutes attached to this event. Show them.