steel plates added to the structure (needed to strengthen the structure for the crane operation)
flowmeters procured -> will be installed this afternoon on the structure
Michael Lazzaroni agreed for a preparation area close to T9. Discussed also with the safety and there should be no problems to start operating our system before our TB period. -> This afternoon I'll check that everything there is a ground point to be used and if there is a place to fix our gas bottles
Idea to mode the setup to the PS on Oct 7
Material for TB
See slides from Darina uploaded here
To be provided at CERN:
Terminators (Hirose and Panasonic)
Converters Panasonic to Hirose (for tracker)
cabling
Power boxes to hybrid (provided by SRS or fabricated at GDD)
HDMI
Ethernet
Transformers to power power boxes
ethernet switch
computer screen
Large fans to cool hybrids
Power cords for all the equipment (power boxes, mini crates, fans, ethernet switch)
Extra SRS components (to check with Mauro and Naples)
Firmware
Check the firmware of all the components we are going to use