Speakers:
Angela Zaza
(Universita e INFN, Bari (IT)),
Antonello Pellecchia
(Universita e INFN, Bari (IT)),
Lisa Generoso
(Universita e INFN, Bari (IT)),
Luigi Longo
(Universita e INFN, Bari (IT)),
Maryna Borysova
(Weizmann Institute of Science),
Mauro Iodice
(INFN - Sezione di Roma Tre),
Michela Biglietti
(INFN Roma Tre),
Romano Orlandini
(Universita e INFN Roma Tre (IT))
Mechanical structure:
- installed 8 20x20cm2, with the same configuration of last 2 years TB, and 2 µRWELL 50x50cm2
- all the supports for fans have been installed
- all the supports for the VMM3a hybrids are now in place



- handling request foreseen for Monday at 9:30 am, https://edh.cern.ch/Document/SupplyChain/SIT/11917487
- internal transport on Tuesday at 10am, https://edh.cern.ch/Document/SupplyChain/SIT/11917503
- TO BE REMINDED:
- the centre of the structure is at 124cm, while the beam height is at 138cm
- asked for some bricks and shims to reach the needed quota
Gas:
- request at the following link ; just a reminder to check on wednesday that they will not put the ArCO2Iso in the flammable gas area
- ArCO2, ArCO2Iso will be provided by gas team
- ArCO2CF4 are stored at GDD gas area (154/G0-922F); the following bottles can be used (in red the code written on the bottles)
- Gas rent./CRFDGCY001-0BA168NEA
- Gas rent./CRFDGCY001-0BA1GP12N
- Gas rent./CRFDGCY001-0BA12AKY6
- Gas rent./CRFDGCY001-0BA1GP0AK

Pool:
- HV board
- 2 crate nim (one for CR, one for experimental area)
- discriminator, fanout, dual timer, scaler
- delta power supply for fans
- 5 attenuators (trigger, scintillator with hole, 2 cherenkov, 1 spare)
Micromegas chambers
- understood the issue: drift vias was not so deep enough to put in communication HV pin and pad on the RO PCBs
Electronics
- VMM3a PC (from RM3/Na)
- 1 SRS crate (from Bari)
- 3 FECs (2 from bari, 1 from RM3/Na) -> look for one more FEC
- 3 DVMMs (2 from bari, 1 from RM3/Na) -> look for one more DVMM
- 1 CTF (from Bari)
- 32 VMM3a hybrids (16 from bari, 8 from RM3/Na, 8 from CERN)
- 32 LV cables (from CERN)
- 4 PBXs (2 from Bari, 2 from CERN)
- most probably we need to change the firmware on all the FECs
HV:
- mainframe hostname: mpgdbari-sy
- HV board:
- A1833N set at VMax:4kV, IMax:2mA, IRes: 200nA for Scintillators and GEMs; manual: https://wiki.infn.it/_media/strutture/lnf/da/btf/dispositivi/a1733b-a1833b_rev10.pdf
- A1821N set at VMax: 3kV, IMax: 20µA, IRes:2nA for MM/µRWELL drift
- A1821HN set at VMax: 3kV, IMax: 20µA, IRes:1nA for MM/µRWELL readout