Update from Nico P.
- Working on lifting and handling tooling.
- Some orders still to be placed (BOM documents are ready). Juan will prepare a technical spec. and try to manage the procurement :
- Impregnation mold
- Reaction to impregnation transfer
- Coil components
- Waiting from Sylvain's feedback on instrumentation
Update from Dimitrios:
- Finished the 2D/3D for the bullet system.
- We need to produce drawings to machine a pair of each bullets and bring them to EN-MME
- Drawings for the endplate and rods missing. For the moment in stand-by (see below)
- Decision to consider non-symmetric ends: on lead end-side the plate will not have the opening for the bladders. In non-lead-end side the plate will not have the opening for the leads.
- Action: Dimitrios to prepare a model of the connection and non-connection side (with the current thickness). Jose to simulate it. Based on results, we optimize the thickness. We expect to gain a bit.
- To be prepared right away.
Update from racetrack mock-ups:
- Actions:
- Contact Oscar to check if he can provide preliminary results for the second DIC.
- Wrap-up slides to be prepared for next week (Nico and Jose)
- Previous mock-ups:
- Pole: From 2 mm to 0.8 mm (closing by 1.2 mm)
- Molds: From 4 mm to 2.88 mm (closing by 1.12 mm)
- Third mock-up:
- Pole: From 4 mm to 2.8 mm (closing by 1.2 mm)
- Molds: From 8 mm to 6.8 mm (closing by 1.2 mm)
Update from Nico B.:
- No much advancement in the measurement / machining system. Jerome is pretty busy
- Rather working in the assembly table, trying to use as much as possible what we already have
- Bladders to be tested and production launched (Nico B. has a sample of the longitudinal welded tube)
Update from Vendela:
- 3 responses from different vendors
- WMH Group
- 7075-T7351
- 7010-T7451
- 7050-T7451
- Aksel
- Allega
- AXEL Al-7075
- Vendela will ask for the material properties and then choose a candidate. The candidate will be characterized at CERN at cold.