PASTE meeting

→ Europe/Zurich
Andrei Tsaregorodtsev
Description
CERN, bat 2 R-030 To join the telephone conference, click here: https://audioconf.cern.ch/call/0122882 To dial in to the conference: a. Dial +41 22 7676000 b. Enter access code 0122882
Production and PASTE Meeting, 26th June 2007, CERN Chair: A.Tsaregorodtsev Minutes: S. Paterson CERN: M.Bargiotti, A.Casajus, G.Castellani, P.Charpentier, J.Closier, R.Graciani, G.Kuznetszov, S.Paterson, R.Santinelli, A.Smith, A.Tsaregorodtsev Phone: R.Bernet, N.Brook, A.Carbone, U.Marconi, M.A.S.Miguelez, R.Nandakumar Apologies: D.Perego 1. Production Status Report Minutes from the production meeting are available here. Joel reported the production status in Davide's absence. ~2K jobs have been running per day but not more. The mask has been checked for consistency and sites consuming many pilots have been banned. It was agreed to ensure every mask change is logged via an email to the production list. ( ACTION: Joel ) SAM reports ~47 sites eligible for LHCb jobs (out of ~108 total sites). Recent investigations have shown install_project.py is creating links in the shared area. The check for installing software should remain in the Job Agent but the software distribution module should be revisited. ( ACTION: Joel, Stuart, Hubert ) For the reconstruction, some data for several jobs have failed to be staged after 6 attempts in 24hrs. Joel has developed a python script to extract the necessary information from the JobDB. At CERN the problem is yet to be understood. The specified files do not exist for staging failures at GridKa and PIC. Raja agreed to look at the situation at RAL. ( ACTION: Raja ) For the stripping, Joel mentioned that all files were re-entered into the processing DB after some cleaning by Gennady. There have been many failures in DaVinci so far. Stripping jobs for CNAF have not yet started and this should be investigated because e.g. software tags could be incorrect. ( ACTION: Joel ) Stripping jobs have been submitted to CERN, PIC, RAL, CNAF, IN2P3 but not to NIKHEF (SARA problem) or GridKa (in downtime). DIRAC v2r15 is now in production so castor protocol is in use at CERN. 2. Production Operations Issues There was some discussion on the issue of software installation and it was concluded that software should continue to be installed in jobs. For DIRAC3 we can log whenever a job has to install the software and report any abnormal site behaviour. Software tags can be presented by pilot agents but this will be ignored in the case where no software tag requirements are in the job JDL. The maximum concurrent jobs problem at GridKa is currently under investigation. Joel reported that Johan and Michael were following these issues at a high level. The GridKa tape and SRM configurations are also being checked. On some of the SLC4 sites edg-brokerinfo has ceased to function, a fix for this should be introduced to the pilot wrapper script. ( ACTION: Gianluca ) Several use-cases have appeared for the shipped middleware with DIRAC e.g. NorduGrid, 64 bit platforms, LCG. It was agreed to build a combined distribution to accommodate all use-cases. ( ACTION: Roberto, Roland, Matvey ) Philippe attached a storage migration plan to the agenda. This stimulated some discussion and it was agreed to update the twiki page for production procedures. ( ACTION: Philippe ) Marianne was reminded to create a twiki page for data management operations e.g. file removal status. ( ACTION: Marianne ) Andrei reported that the proxy renewal fixes appeared to be stable. Gianluca was asked to continue the code cleanup and affected components will be part of the next patch release of DIRAC. Print statements should be removed from the LCG utilities. ( ACTION: Gianluca ) Stuart conveyed no response had been made regarding the v2r15 release. At the time of writing the OK has been given by Andrew Maier. Andrei suggested we should deploy the DIRAC API on lxplus. ( ACTION: Joel ) Marianne reported that some files have been cleaned and the lists are being prepared for the remainder. Transfers to PIC have been failing and other channels have been blocked, investigations are ongoing. ( ACTION: Marianne ) 3. DIRAC3 Tasks As mentioned last week, Ricardo compiled the following PIC support document. 4. AOB None
There are minutes attached to this event. Show them.
    • 10:00 → 10:15
      Production status report 15m
      - Report from the Production meeting:
    • 10:15 → 10:45
      Production operations issues 30m
      - Managing gLite WN's - LCG middleware shipped with DIRAC - Migrating data from one SE to another - Using VOMS groups vs roles for LHCb discussion - Proxy renewal in production - DIRAC releases v2r15, v2r15p1
      text
    • 10:45 → 11:05
      Request for DIRAC services at PIC 20m
      Speaker: Ricardo Graziani
      document
    • 11:05 → 11:15
      AOB 10m